My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> PART 3: EXECUTION r <br /> 2 <br /> 3 3.01 SURFACE PREPARATION <br /> 4 <br /> 5 Concrete areas to be in contact with mortar or grout shall be cleaned of all loose or foreign <br /> 6 material that would in any way prevent bond between the mortar or grout and the concrete <br /> 7 surfaces. The surfaces shall be flushed with water and allowed to dry to a surface dry , <br /> a condition immediately prior to placing the mortar or grout. <br /> 9 <br /> 10 3.02 MORTAR ' <br /> n <br /> 12 A. Mortar shall be machine mixed in an approved type of mixer in which the quantity of water <br /> 13 can be accurately and uniformly controlled. The mixing time shall not be less than 5 r <br /> 14 minutes, approximately 2 minutes of which shall be for mixing the dry materials and not less <br /> 15 than 3 minutes for mixing the mortar after the water has been added. When hydrated lime <br /> 16 is used for mortar requiring a lime content, either the dry-mix method or first converting the <br /> 17 hydrated lime into a putty may be used. Where the dry-mix method is employed, the ' <br /> 19 materials for each batch shall be well turned over together until the even color of the mixed, <br /> 19 dry materials indicates that the cementitious material has been thoroughly distributed <br /> 20 throughout the mass, after which the water shall be gradually added until a thoroughly , <br /> 21 mixed mortar of the required plasticity is obtained. <br /> 22 <br /> 23 B. Mortar boxes shall be cleaned out at the end of each day's work, and all tools shall be kept <br /> 24 clean. Mortar that has begun to set shall not be used. , <br /> 25 <br /> 26 3.03 GROUT <br /> 27 <br /> 26 A. Grout may be placed in the reinforced hollow concrete block wall after the units have been <br /> 29 set for at least 24 hours. <br /> 30 <br /> 31 B. Grout shall be placed by grout pump, concrete hopper or bucket. , <br /> 32 <br /> 33 C. Grout spaces shall not be wet prior to pouring grout. <br /> 34 ,35 D. Unless otherwise indicated the grout shall have a 9 inch to 11 inch slump. <br /> 36 <br /> 37 3.04 PLACEMENT ' <br /> 36 <br /> 39 A. Mortar and grout shall completely fill and shall be tightly packed into recesses and holes, <br /> 40 on surfaces, and under structural members. <br /> 41 ,az B. Grouting, jointing and pointing of mortar used for reinforced hollow concrete block shall <br /> 43 conform to Section 04200. <br /> 44 '45 3.05 CURING <br /> 46 <br /> 47 After placing, any surfaces of mortar or grout shall be kept damp for a period of not less <br /> 4e than 3 days. , <br /> 49 <br /> 50 <br /> 51 ' <br /> MORTAR AND GROUT <br /> 042694 04100-2 r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.