My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Each instrument panel mounted device shall be identified with engraved 2-color black <br /> bakelite nameplates. The legends shall clearly identify each device function, avoiding the <br /> Luse of abbreviations. All nameplates shall be secured with stainless steel screws. <br /> G. Workmanship: The equipment and any accessories shall be a product of good <br /> workmanship and shall be free from any defects that will affect their appearance or <br /> serviceability. <br /> 3.3 FACTORY INSPECTION AND TESTS <br /> A. Factory Inspection: Prior to delivery to the Owner, the Contractor shall notify and give <br /> the Engineer the opportunity to inspect the completed engine generator assembly at the <br /> supplier's location. A written notice shall be given to the Owner 7 days prior to the <br /> shipping date for the factory inspection. Owner Engineer factory inspection costs will be <br /> paid by the Owner. The engine generator shall not be shipped from the supplier to the <br /> Owner without written authorization from the Owner Engineer. <br /> B. Factory Tests:The engine generator to be supplied shall be tested by the manufacturer prior <br /> to shipment. All tests shall be made with all accessories installed. The factory tests shall <br /> ' be made under varying loads for a minimum of four hours total. <br /> The factory testing shall include the following tests: <br /> 1. Single step load pickup. <br /> 2. Transient and steady state governing. <br /> 3. Safety shutdown device testing. <br /> 4. Voltage regulation. <br /> 5. Rated power. <br /> 6. Maximum power. <br /> ' C. A public notary certified typewritten factory test report shall be provided which lists the <br /> factory tests performed, results of the each test, name & phone number of person who <br /> performed the tests, date(s) of when tests were performed, serial & part number of <br /> ' equipment tested, all adjustment or setting values, and failures encountered & repairs <br /> made during testing. The factory test report shall be submitted to the Owner for review <br /> and approval prior to shipment of any equipment. <br /> 1 <br /> ENGINE GENERATOR <br /> 11500 - 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.