My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 SPARE PARTS <br /> A. The Contractor shall supply sufficient spare parts to support the engine generator <br /> ' throughout the warranty period. <br /> B. The following spare parts shall be provided to the Owner: <br /> 1. 12 each of each type and size of fuse. <br /> 2. 12 each fuel filters for each type. <br /> 3. 12 each oil filters for each type. <br /> 4. 4 each air filters for each type. <br /> 5. 24 spare lamps for each type. <br /> ' C. Spare parts shall be packaged for safe shipping and storage and clearly labeled with part <br /> name & number. <br /> 3.7 OPERATION AND MAINTENANCE MANUALS <br /> A. At the time of delivery of the equipment, the Contractor shall submit for approval a <br /> minimum of one (1) set of "operation and maintenance" (0 & M) manuals. <br /> B. Before receiving payment for more than 90 percent of the purchase value of any <br /> "equipment", the Contractor shall deliver to the Engineer four (4) sets of acceptable and <br /> complete "operation and maintenance" manuals covering that equipment assembly. <br /> C. At least one of these sets of 0 & M manuals shall be made up of "original" (no copies or <br /> reproductions) documents. <br /> D. Manufacturer's or Contractor's standard brochures or manuals shall be edited to reflect <br /> ' only that model or series of equipment installed on this project, including any <br /> modifications. All extraneous material shall be crossed out or otherwise removed in a <br /> manner acceptable to the Engineer. All text, tables, graphs, and drawings shall be clear <br /> and legible. Black and white copies of color originals are not acceptable. Color originals <br /> or true color copies of these originals shall be provided in each set. <br /> 1 <br /> ENGINE GENERATOR <br /> 11500 - 21 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.