Laserfiche WebLink
r <br /> ' 1 SECTION 11510 <br /> 2 <br /> 3 BLOWERS <br /> 4 <br /> 5 <br /> ' 6 PART 1: GENERAL <br /> 7 <br /> 8 1.01 DESCRIPTION <br /> s <br /> 10 The work of this section consists of installing blowers and appurtenances to provide <br /> 11 aeration air. <br /> 12 <br /> 13 1.02 RELATED WORK SPECIFIED ELSEWHERE <br /> 14 <br /> 15 A. Section 01030: Owner Furnished Equipment <br /> ' 1s <br /> 17 B. Section 11010: General Mechanical Provisions <br /> 18 <br /> 19 C. Section 15010: General Process and Onsite Utility Piping Provisions <br /> 20 <br /> 21 D. Section 15042: Ductile Iron Pipe <br /> 22 <br /> r 23 E. Section 15071: Schedule 40 PVC Pipe <br /> 24 <br /> 25 F. Section 15100: Valves <br /> 26 <br /> 27 G. Section 15080: Piping Accessories and Appurtenances <br /> 28 <br /> 29 1.03 SUBMITTALS <br /> ' 30 <br /> 31 A. In accordance with Section 01300. <br /> 32 <br /> 33 <br /> 34 PART 2: MATERIALS <br /> 35 <br /> 36 2.01 APPURTENANCES <br /> 37 <br /> 38 A. Flexible connections for intake and discharge, suitable for temperature conditions. <br /> 39 <br /> ao B. Anti-vibration rubber mounting pads between pedestal base and foundation. <br /> 41 <br /> 42 C. Pressure gauge or manometer mounted on discharge pipe and designed to withstand <br /> 43 vibrations and temperature conditions. <br /> 44 <br /> 45 D. Thermometer, vibration resistant, for discharge. <br /> ' 46 <br /> 47 <br /> 48 <br /> r <br /> BLOWERS <br /> 050694 11510-1 <br /> i <br />