Laserfiche WebLink
r <br /> 1 3.06 FINAL PIPE CLEANING <br /> 2 <br /> 3 Prior to testing all pipe lines shall be cleaned. Lines shall be cleaned by high pressure <br /> ' 4 waterjet or by balling and flushing. A visual inspection will insure compliance of this <br /> 5 requirement. <br /> 6 <br /> r 7 3.07 TESTING <br /> 8 <br /> 9 Section 01667. <br /> 10 <br /> 11 3.08 SURFACE FINISH WORK <br /> 12 <br /> 13 Section 02221. <br /> 14 <br /> 15 <br /> 16 <br /> 1 <br /> 188 <br /> 19 END OF SECTION <br /> r <br /> r <br /> r <br /> r <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> REINFORCED CONCRETE PIPE <br /> r042894 150413 <br />