Laserfiche WebLink
1 a precast concrete box, Christy B9XD; Brooks No. 36, or equal. <br /> 2 <br /> 3 B. Interior Floors: Jonespec No. 61000; Smith No. 4023, or equal. <br /> 4 <br /> 5 C. Finished Walls: Round chrome plated or stainless steel access plate and screw, Jonespec <br /> 6 No. 63150; Smith No. 4532, or equal. <br /> 7 <br /> 6 D. Cleanout plugs of extra heave bronze. <br /> 9 <br /> 10 <br /> 11 2.06 OTHER MATERIALS <br /> 12 <br /> 13 Provide other materials, not specifically described but required for a complete and proper <br /> 14 installation. <br /> 15 <br /> 16 <br /> 17 PART 3: EXECUTION <br /> 16 <br /> 19 3.01 SURFACE CONDITIONS <br /> 20 <br /> 21 Examine the areas and conditions under which work of this Section will be performed. <br /> 22 Correct conditions detrimental to timely and proper completion of the Work. Do not <br /> 23 proceed until unsatisfactory conditions are corrected. <br /> 24 <br /> 25 3.02 PLUMBING SYSTEM LAYOUT <br /> 26 <br /> 27 A. Lay out the plumbing system in careful coordination with the Drawings, determining proper <br /> 26 elevations for all components of the system and using only the minimum number of bends <br /> 29 to produce a satisfactorily functioning system. <br /> 30 <br /> 31 B. Follow the general layout shown on the Drawings in all cases except where other work may <br /> 32 interfere. Lay out pipes to fall within partition, wall, or roof cavities, and to not require <br /> 33 furring other than as shown on the Drawings. <br /> 34 <br /> 35 3.03 TRENCHING AND BACKFILLING <br /> 36 <br /> 37 A. Perform trenching and backfilling associated with the work of this Section in strict <br /> 3e accordance with the provisions of Section 02221 of these Specifications. <br /> 39 <br /> 40 3.04 INSTALLATION OF PIPING <br /> 41 <br /> az A. General: <br /> 43 <br /> 44 1. Thoroughly clean items before installation. Cap pipe openings to exclude dirt until <br /> 45 fixtures are installed and final connections have been made. <br /> 46 <br /> ' 47 2. Cut pipe accurately, and work into place without springing or forcing, properly clearing <br /> 46 windows, doors, and other openings. Excessive cutting or other weakening of the <br /> 49 building will not be permitted. <br /> 50 <br /> 51 3. Remove cutting and threading burrs before assembling piping. <br /> PLUMBING PIPING SYSTEMS <br /> 050694 15410-3 <br />