Laserfiche WebLink
1 required to facilitate mounting and eliminate void spaces between equipment and wall <br /> 2 to ensure adequate bearing contact. <br /> 3 <br /> 4 3.03 CLEANING <br /> 5 <br /> 6 Clean equipment of dirt and debris upon completion of installation. <br /> 7 <br /> s 3.04 FIELD DUALITY CONTROL <br /> s <br /> 10 Upon completion of installation of equipment and after units are water pressurized, test <br /> 11 equipment to demonstrate capability and compliance with requirements. When possible, <br /> 12 correct malfunctioning units at site, then retest to demonstrate compliance; otherwise, <br /> 13 remove and replace with new units and proceed with retesting. <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 END OF SECTION <br /> r <br /> EMERGENCY SAFETY EQUIPMENT <br /> 050694 15444-3 <br />