My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION 16000 <br /> ELECTRICAL <br /> PART 1 - GENERAL <br /> ' 1.1 SCOPE OF WORK <br /> A. The Contractor shall install, ready for use, the electrical system as specified herein and shown <br /> on the Contract drawings. This document describes the function and operation of the system <br /> and particular components, but does not necessarily describe all necessary devices. All <br /> ' components and devices shall be furnished and installed as required to provide a complete <br /> operable and reliable system for accomplishing the functions and meeting the performance set <br /> forth hereinafter. <br /> ' B. Furnish all required labor, materials, project equipment, tools, construction equipment, safety <br /> ' equipment,transportation, test equipment,incidentals, and services to provide a complete and <br /> operational electrical system as shown on the Drawings, included in these Specifications, or <br /> required for fully operating facilities. <br /> C. The major areas in the scope of work which includes both the furnishing and installation are: <br /> 1. Main 400 amp, 480 VAC, 3 phase utility metering, transformer pad, and underground <br /> service. <br /> 2. Power distribution panel, fighting panel "A", transformer "A" and the automatic transfer <br /> switch(ATS). <br /> 3. Instrumentation system including float switches, magnetic flowmeter, annunciator, and <br /> dialer. <br /> 4. Building lighting and receptacles. <br /> 5. Area lighting. <br /> 6. Miscellaneous conduits,junction boxes, pull boxes, field interconnection wiring, and <br /> associated hardware for the new treatment plant. <br /> 7. Trenching, back filling, and compaction of each underground conduit route. <br /> ELECTRICAL <br /> 16000 - 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.