Laserfiche WebLink
1 <br /> B. The Contract drawings are generally diagrammatic; exact locations of electrical products shall <br /> be verified in the field with the Engineer. Except where special details on drawings are used <br /> to illustrate the method of installation of a particular piece or type of equipment or materials, <br /> the requirements or descriptions in this Section shall take precedence in the event of conflict. <br /> C. Location at facilities of new equipment, inserts, anchors, panels, pull boxes, conduits, <br /> stub-ups, and fittings for the electrical system are to be determined by the Contractor and <br /> Owner Engineer at time of installation. Contractor shall make minor adjustments to locations <br /> of electrical equipment required by existing conditions and coordination with other trades at <br /> no additional cost. <br /> D. The Contractor shall examine the architectural, mechanical, structural, electrical and <br /> ' instrumentation equipment provided under other Sections of this Contract in order to <br /> determine the exact routing and final terminations for all conduits and cables. The exact <br /> locations and routing of cables and conduits shall be governed by structural conditions, <br /> ' physical interferences, and the physical location of wive terminations on equipment. Conduits <br /> shall be stubbed up as near as possible to equipment terminals. <br /> E. All equipment shall be installed and located so that it can be readily accessed for operation <br /> and maintenance. The Owner Engineer reserves the right to require minor changes in location <br /> of equipment, without incurring any additional costs. <br /> F. Provide means to furnish equipment and accessories, do the installation, complete <br /> connections, submit documentation, perform start-up, and be responsible for the warranty. <br /> G. Where conduits are shown as"home runs" on the Contract drawings or stated to be furnished, <br /> but not explicitly shown as part of the scope of work; the Contractor shall provide all fittings, <br /> boxes,wiring, etc. as required for completion of the raceway system in compliance with the <br /> NEC and the applicable specifications in this Section. <br /> H. No changes from the Contract drawings or specifications shall be made without written <br /> approval of the Owner. Should there be a need to deviate from the Contract documents, <br /> submit written details and reasons for all changes to the Owner for favorable review. <br /> ' I. The resolution of conflicting interpretation of the Contract documents shall be as determined <br /> by the Owner. <br /> ELECTRICAL <br /> 16000 - 3 <br />