the Special Provisions plus any extensions of time as <br /> provided for herein , damage will be sustained by the <br /> Agency , and that it is and will be impracticable to <br /> determine the actual amount of damage by reason of such <br /> delay; and it is therefore agreed that the Contractor will <br /> pay to the Agency the sum set forth in the Special <br /> Provisions, for each and every day' s delay beyond the time <br /> prescribed ; and the Contractor further agrees that the <br /> Agency may deduct and retain the amount thereof from any <br /> monies due the Contractor under the contract. <br /> 9. CULTURAL RESOURCES <br /> G9. 01 Responsibility. In the event cultural resources are <br /> discovered during subsurface excavations at locations of the <br /> work , the Contractor shall cease all construction operations at <br /> the location of such cultural resource find until such time <br /> that a qualified archeologist can be called to assess the value <br /> of these resources and make recommendations to the State <br /> Historic Preservation Officer for further direction. If the <br /> State Historic Preservation Officer or the Engineer directs the , <br /> work be temporarily ceased at the location of the cultural <br /> find , the Contractor shall temporarily suspend the work at the <br /> location. , <br /> G9 .02 Controlling Operation. If the Engineer or the State Historic <br /> Preservation Officer directs that the work be temporarily <br /> suspended for cultural purposes on a portion of the work which <br /> is the current controlling operation or operations on the <br /> contract , the total number of days for which the suspension is <br /> in effect shall be added to the number of allowable contract , <br /> days in computing the total number of allowable contract days. <br /> G9. 03. Non-Controllinq Operation. If a portion of work at the time <br /> of--such suspension is not a controlling operation , but <br /> subsequently does become the current controlling operation the <br /> determining of contract time will be made on the basis of the <br /> current controlling operation or operations. , <br /> G9 . 04. Compensation Determination. If, as a result of a temporary <br /> suspension ot the work at a location or locations , the <br /> Contractor sustains a loss which could not have been avoided by <br /> his judicious handling of forces , equipment, and plant , to <br /> perform other work on the contract, there shall be paid to the <br /> Contractor such amount as the Engineer may find to be fair and <br /> reasonable compensation for such part of the Contractor ' s <br /> actual loss , as , in the opinion of the Engineer , was <br /> unavoidable, to be detemined as follows: <br /> Compensation for idle time of equipment will be determined in <br /> the same manner as determinations are made for equipment used , <br /> in the performance of extra work paid for on a force account <br /> G-44 <br />