My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
basis, with the following exceptions : <br /> (1) The right-of-way delay factor for each classification of <br /> equipment shown in the Department of Transportation <br /> publication entitled "Labor Surcharge Equipment Rental <br /> Rates" of the State of California , will be applied to <br /> ' such equipment rental rate. <br /> (2) The time for which such compensation will be paid will <br /> be the actual normal working time during which such <br /> delay condition exists , but in no case will exceed 8 <br /> hours in any one day. <br /> 1 (3) The days for which compensation will be paid shall be <br /> for all or portions of calendar days , excluding <br /> Saturdays , Sundays , and legal holidays , during the <br /> ' existence of such delay. <br /> Actual loss shall be understood to include no items of <br /> expense other than idle time of equipment and necessary <br /> payments for idle time of men and the cost of extra moving of <br /> equipment. Compensation for idle time of equipment will be <br /> determined by the Engineer and compensation for idle time of <br /> men will be determined by the Engineer as "Labor" , and no <br /> markup will be added in either case for overhead and profit. <br /> Compensation for the cost of moving equipment shall be the <br /> actual cost without markup for overhead or profit. <br /> 1 <br /> ' G-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.