My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01010 <br /> 3 GENERAL CONSTRUCTION INFORMATION AND REQUIREMENTS <br /> 4 <br /> 5 <br /> s PART 1: GENERAL <br /> 7 <br /> 8 1.01 DESCRIPTION <br /> s <br /> 10 This section covers the general requirements for the Contractor's temporary facilities at the <br /> 11 job site and for the prosecution of the work. <br /> 12 <br /> 1 13 1.02 ACCESS TO THE SITES <br /> 14 <br /> 15 Access to the sites shall be as shown on the plans or as directed by the Engineer. <br /> ' 1s <br /> 17 PART 2: PRODUCTS <br /> 18 <br /> I 19 2.01 MATERIALS <br /> 20 <br /> 21 See Divisions 2 through 16 for materials and methods of installation. <br /> 22 <br /> 23 PART 3: INSTALLATION <br /> 24 <br /> 25 3.01 CONTRACTOR'S PLANT AND EQUIPMENT <br /> 26 <br /> 27 A. Security: The Contractor shall at all times be responsible for the security of his plant and <br /> 28 equipment. The Owner will not take any responsibility for missing or damaged equipment, <br /> 29 tools or personal belongings. <br /> 30 <br /> 31 B. Office: During the performance of the contract, the Contractor shall maintain a suitable <br /> 32 office at the site of the work which shall be the headquarters of the Contractor's <br /> 33 representative. <br /> 34 <br /> 35 C. Workshop and Storage Facilities: The Contractor shall provide storage buildings for the <br /> 36 protection of equipment, materials, supplies and tools and shall insure that the building <br /> 37 used for the storage of materials which deteriorate when exposed to moisture is <br /> 38 moistureproof. Workshops and storage buildings shall be located as designated by the <br /> 39 Engineer, and shall be clean and in proper order at all times. <br /> 40 <br /> 41 D. Parking Facilities: Parking areas at the project location for the automobiles used by the <br /> 42 Contractor's construction employees and his own vehicles shall be designated by the <br /> 43 Engineer. <br /> 44 <br /> 45 E. Temporary Fencing: The Contractor shall provide chain link fencing where needed in order <br /> 46 to provide full enclosure at all times of all areas of work with either permanent or temporary <br /> 47 chain link fencing. <br /> 48 <br /> 4s <br /> GENERAL CONSTRUCTION INFORMATION & REQUIREMENTS <br /> 051194 01010-1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.