My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Effluent Filter <br /> 2 <br /> 3 Quantity Item <br /> 4 <br /> 5 1 Dynasand Filter, Model DSF-38 <br /> 6 <br /> 7 1.04 MANUFACTURER SUBMITTALS <br /> 8 <br /> 9 Selected portions of the Manufacturer's submittals for the major items of equipment to be <br /> 10 furnished by the Owner. Complete submittals may be reviewed at the office of the <br /> 11 Engineer. <br /> 12 <br /> 13 <br /> ' 14 <br /> 15 PART 2: PRODUCTS <br /> 16 <br /> 17 2.01 MATERIALS <br /> 18 <br /> 19 The Contractor shall furnish any materials required for the installation which are not <br /> 20 indicated as being supplied by the Owner. The materials shall be as specified in Divisions <br /> 21 2 through 16. <br /> 22 <br /> 23 <br /> 24 PART 3: EXECUTION <br /> 25 <br /> 26 3.01 FREIGHT <br /> 27 <br /> ze All equipment is to be shipped, freight allowed, by the manufacturer. <br /> 29 <br /> 30 3.02 DELIVERY OF EQUIPMENT <br /> 31 <br /> 32 The Contractor shall take delivery of the equipment and shall be responsible for the <br /> 33 unloading and placement of the equipment. Owner supplied equipment and materials will <br /> 34 be delivered, freight paid, to the site, but shall be unloaded by the Contractor. The <br /> 35 Contractor shall check for any visible shipping damage and for completeness, i.e., any <br /> 36 separately shipped assemblies or accessories. <br /> 37 <br /> 39 The Contractor shall be responsible for verifying the delivered articles against the list <br /> 39 provided by the manufacturer. The Contractor shall notify the Owner of any errors or <br /> 40 omissions. <br /> 41 <br /> 42 3.03 STORAGE AND PROTECTION OF EQUIPMENT <br /> 43 <br /> 44 The Contractor shall be responsible for the storage and protection of the equipment after <br /> 45 delivery. Any equipment not indicated by the Contractor to be damaged or missing at the <br /> 46 time of delivery but later determined to be damaged or missing shall be repaired or <br /> 47 replaced by the Contractor, unless the Contractor can provide reasonable proof that he is <br /> 48 not at fault. <br /> 49 <br /> 50 <br /> OWNER FURNISHED EQUIPMENT <br /> 081894 01030-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.