My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 3.04 INSTALLATION OF EQUIPMENT - GENERAL , <br /> 2 <br /> 3 A. Owner Supplied Equipment and Materials: The Contractor shall install all Owner supplied <br /> 4 equipment and materials as shown on the plans. Installation shall be in complete , <br /> 5 conformance with the recommendations of the manufacturer and the specifications. All <br /> 8 inserts, cut-outs, brackets, and shall be installed to suit the installations as shown. <br /> 8 '9 B. Contractor Furnished Equipment: All equipment and materials not specifically listed as <br /> 10 furnished by the Owner shall be furnished and installed by the Contractor. In this regard, <br /> 11 the Contractor should note that expansion bolts required for installation of Aero-Mod , <br /> 12 supplied items are not supplied by the Owner. All such bolts within the Selector, Aeration, <br /> 13 Clarifier, Surge, Aerobic Digester unit shall be stainless steel as recommended by Aero- <br /> 14 Mod. <br /> 15 ,16 3.05 TESTING <br /> n <br /> 18 Equipment shall be tested at design conditions by the Owner in accordance with the , <br /> 19 equipment manufacturer's instructions. Necessary repairs to equipment during or after <br /> 20 testing will be the responsibility of the equipment supplier. This provision does not relieve <br /> 21 the Contractor of his responsibility for facilities and equipment supplied by him. Any work <br /> 22 of the Contractor found to be defective shall be corrected promptly by the Contractor. <br /> 23 <br /> 24 3.06 STARTUP <br /> 25 <br /> 26 The following service trips shall be provided by the manufacturer for start-up, operator <br /> 27 training, or troubleshooting: <br /> 28 <br /> 29 Owner Furnished Equipment No. Trips Days per Trip <br /> 30 <br /> 31 WWTP Equipment 3 2 <br /> 32 Effluent Filter 1 2 ' <br /> 33 Sludge Dewatering Equipment (included w/ WWTP Equipment) <br /> 34 <br /> 35 All trips will be arranged at least two weeks in advance by the Engineer as appropriate to <br /> 38 coordinate his efforts to take full advantage of the manufacturer's site visits and shall <br /> 37 cooperate with the manufacturer as required to facilitate construction and startup. <br /> 38 <br /> 39 ,40 <br /> 41 END OF SECTION <br /> OWNER FURNISHED EQUIPMENT <br /> 081594 01030-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.