Laserfiche WebLink
o #6(5: The large metal tank will be pumped as soon as possible. Evergreen <br /> has been contacted and the district is waiting for them to confirm the <br /> date they will come by and provide their services. A new label will <br /> be attached which will include all required information. The auto shop <br /> teacher will inspect the tank daily in accordance with CCR <br /> 66265.195(a) and CCR 66265.174. Inspection will include the 1) <br /> overfill/spill control equipment; 2)the above ground portions of the <br /> tank system for corrosion or releases of waste; 3) data gathered from <br /> monitoring equipment and leak detection equipment; 4)the <br /> construction of materials and the area immediately surrounding the <br /> externally accessible portion of the tank system including secondary <br /> containment structures to detect erosion or signs of releases of <br /> hazardous waste; and 5)the level of waste in any uncovered tanks to <br /> ensure compliance with CCR section 66265.194 (b). A sample of the <br /> daily inspection sheet(Page 181) is attached. District central staff will <br /> inspect daily inspection log quarterly to ensure compliance. <br /> o #4C4, #605, #701: The one gallon plastic milk jug storing"Metal Waste <br /> Cu, Fe, Al,Ag" will be removed as soon as possible. Evergreen has <br /> been contacted and the district is waiting for them to confirm the date <br /> they will come by and provide their services. The materials were <br /> transferred to a closed container and a label was attached, which <br /> includes the 6 required elements of information. Metal waste will be <br /> removed by a licensed hazardous wate handler as soon as possible. <br /> Evergreen has been contacted and the district is waiting for them to <br /> confirm the date they will come by and provide their services. <br /> o #8C4, #808: All fluorescent tubes, compact halogen lights, alkaline <br /> batteries, computer monitors, and CPUs were removed from the <br /> theater veranda, the Bldg A staff room, and the chemical room of <br /> Bldg E on January 13, 2012. To date, no additional waste has <br /> accumulated. <br /> o #902, #907: All aerosol cans were removed from the theater veranda, the <br /> Bldg A staff room, and the chemical room of Bldg E on January 13, <br /> 2012. To date, no additional waste has accumulated. <br /> Si c rely, <br /> sey . G od 1, , M.B.A. <br /> Associ to uperintendent of Business Services <br /> Enclos e <br /> CG/tw <br />