Laserfiche WebLink
Applied Process Cooling Corporation <br /> February 24, 2020 Quote#20016-SM <br /> Mr. Mark McPherson <br /> The Wine Group <br /> 18001 Murphy Road <br /> Ripon, CA 95366 <br /> Subject: Pump Replacement <br /> Dear Mr. McPherson <br /> We are pleased to provide this proposal to replace the transfer pump at The Wine Group Facility in Ripon, CA. <br /> This pump is located on the SA1 B accumulator skid. We have proposed two option for your review: <br /> Option 1 Proposed Scope of Work: <br /> Furnish and install a new Teikoku R42-119C4DM Pump <br /> 0 55 GPM @ 72'Total Head <br /> o 1.7HP Rating 60Hz, 460V <br /> o Ammonia Rated <br /> Furnish and install new suction, discharge and vent piping to new pump <br /> Provide service labor to check rotation of pump <br /> Provide electrical service to re-connect new pump <br /> o APCCO to assume existing starter panel is efficient <br /> Upon installation of the new pump,evacuate, and hot gas leak test new welds installed by APCCO <br /> Upon completion of the leak test, provide startup service to return the system to normal operation <br /> r All Work to be performed on straight time <br /> Detailed Project Costs for Option 1: <br /> TeikokuPump............ ...........................................................................................................$ 9,335.00 <br /> Materials of Construction .......................................................................................................$ 1.616.00 <br /> EstimatedFreight Cost...........................................................................................................$ 668.00 <br /> Tax@ 7.75% .........................................................................................................................$ 849.00 <br /> ConstructionLabor..... ...........................................................................................................$ 5,325.00 <br /> ServiceLabor.........................................................................................................................$ 3.178.00 <br /> Subcontracted Services (Electrical).......................................................................................$ 3.335.00 <br /> ProjectTotal ..................................................................................................................$ 24,306.00 <br /> Option 2 Proposed Scope of Work: <br /> Demo existing liquid transfer vessel and associated piping <br /> Furnish and install a new RVS Matrix Transfer Retrofit Package (MTRP). RVS pump skid to include: <br /> o (1) RVS20-200-10-ALP High Differential Pump <br /> o New Danfoss Isolation, Check, reseating relief regulator, and solenoid valves <br /> o Suction and Discharge transducers, <br /> 0 Matrix II LTC Liquid Transfer Control Panel (NEMA 3 enclosure) <br /> Panel to be pre-programmed by manufacturer <br /> 3► Furnish and install associated piping for new RVS pump package <br /> Provide electrical service for new skid <br /> 0 480 volt feeder from existing control panel near by <br /> 0 120 volt circuit from existing level controller <br /> o Connect new transfer pump to Transfer Pump Panel <br /> o Connect relay contacts on level controller for low level and transfer level control <br /> o Connect new differential pressure switch to Transfer Pump Panel <br /> Locations to Serve You <br /> 4812 Enterprise Way Modesto,CA 95356 1145 Annadale Avenue Sanger,CA 93657 <br /> 3501 Brooklake Road Salem,Oregon 97303 Page 1 of 3 7794 Bell Road Windsor,CA 95492 <br />