Laserfiche WebLink
Option 2 Proposed Scope of Work (Cont.{: <br /> Upon installation of the new pump, evacuate, and hot gas leak test new welds installed by APCCO <br /> Upon completion of the leak test, provide startup service to return the system to normal operation <br /> All Work to be performed on straight time <br /> Detailed Project Costs for Phase 1: <br /> RVSPump Skid Package ......................................................................................................$64,200.00 <br /> Materialsof Construction .......................................................................................................$ 1,642.00 <br /> EstimatedFreight Cost...........................................................................................................$ 2.003.00 <br /> Tax@ 7.75% .........................................................................................................................$ 5,103.00 <br /> ConstructionLabor.................................................................................................................$ 12,998.00 <br /> ServiceLabor.........................................................................................................................$ 4,205.00 <br /> Subcontracted Services (Electrical).......................................................................................$ 8,948.00 <br /> Equipment Rental................ ............. ........ $ 873.00 <br /> ProjectTotal ..................................................................................................................$99,972.00 <br /> Exclusions: <br /> 1. Cost accrued due to the failure of existing valves and equipment(i.e. failed pump down, delayed start-up, <br /> prolonged troubleshooting, etc.) <br /> 2. Any ammonia valves or piping unless noted above <br /> 3. Any pressure and/or leak testing and/or repairs beyond new piping and welds installed by APCCO <br /> 4. Replacement or upsizing of any existing piping or equipment <br /> 5. Any drafting, painting or insulation materials or services <br /> 6. Any temporary chiller rental equipment for plant downtime during construction <br /> 7. Expedited build time or shipping of equipment and/or materials <br /> 8. PSM, RMP, or PSM-driven Management of Change documentation (we will provide necessary <br /> information to a customer-appointed compliance facilitator) <br /> 9. Seismic review and/or additional seismic work if deemed necessary unless noted above <br /> 10. Labor premium differential for weekends, holidays, and/or accelerated project schedules <br /> 11. Design and/or installation of permanent service or access platforms for plant access to piping,valves, <br /> and/or equipment unless noted above <br /> 12. Additional City, County, State, CUPA, and/or Federal Assessments and Requirements. <br /> 13. Local, state, or federal permit fees unless noted above <br /> Page 2 of 3 <br />