Laserfiche WebLink
g . The Traffic Impact Mitigation Fee will be required for <br /> this development . The fee is S1 , 925 . 00 per 1 . 000 gross <br /> square feet of building as "Office" for the sales portion <br /> and S4 , 512 . 00 per 1 , 000 gross square feet of building as <br /> "Retail/Service" for the restaurant portion. The fee is <br /> determined by the number of trips generated by the develop- <br /> ment from the Trip Generation Manual , as published by the <br /> Institute of Traffic Engineers, multiplied by the trip <br /> cost for the stockyard. The fee shall be automatically <br /> adjusted annually by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. <br /> 2 . PUBLIC HEALTH SERVICES : <br /> Ordinance Requirements : <br /> The Ordinance Requirements listed below have been identified <br /> as pertinent to this project . Other Ordinance requirements <br /> may also apply. Ordinance Requirements are not appealable . <br /> a. The water well used for domestic purposes shall become a <br /> noncommunity public water well and will be subject to <br /> approval and permit requirements of the Environmental <br /> Health Division. <br /> b. A septic system shall be required for sewage disposal . <br /> The septic system serving the entire development must be <br /> designed by a registered engineer . A permit from and <br /> approved by the Environmental Health Division is required. <br /> c . The applicant must apply to the Central Valley Regional <br /> Water Quality Control Board for a waste discharge permit . <br /> d. A waste management plan designed by a registered engineer <br /> must be submitted, and it must be approved by the <br /> Environmental Health Division, the Department of Public <br /> Works, and the Regional Water Quality Control Board prior <br /> to any building permits being issued. <br /> e . Three sets of plans for the food facility must be sub- <br /> mitted to and approved by the Environmental Health <br /> Division for a food facility permit . <br /> f . The proposed milking barn shall require Environmental <br /> Health Division and State Department of Agriculture appro- <br /> val if milk is to be shipped for processing. <br /> 3 . BUILDING INSPECTION DIVISION: <br /> Ordinance Requirements : <br /> The Ordinance Reauirements listed below have been identified <br /> as pertinent to this project . Other Ordinance requirements <br /> may also apply . Ordinance Requirements are not appealable . <br /> Amended Conditions - 2 - ( SA-89-25 ) <br />