Laserfiche WebLink
Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Planning Division in <br /> conjunction with the California Depart- <br /> ment of Fish and Game . <br /> Reporting Requirements : Review and approve prior to Improvement <br /> Plan sign off and verify on-site during <br /> project improvement construction. <br /> Mitigation Measure No. 3 : To the greatest extent possible, the <br /> project should be designed to incorporate habitat that is suit- <br /> able for foraging by the Swainson' s Hawk. The Applicant should <br /> provide replacement foraging habitat to compensate for any habi- <br /> tat that is lost on the site . <br /> Monitoring Agency: San Joaquin County Planning Division. <br /> Monitoring Schedule : Execute an MOU with the County that is <br /> binding on the Applicant and which <br /> specifies the details of the habitat re- <br /> placement program. Said MOU shall be <br /> executed prior to approval. of the <br /> project Improvement Plans . <br /> Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Planning Division in <br /> conjunction with the California Depart- <br /> ment of Fish and Game. <br /> Reporting Requirements : Review and approve prior to Improvement <br /> Plan sign off and verify on-site during <br /> project improvement construction. <br /> Mitigation Measure No . 4: As much of the central irrigation <br /> canal and associated vegetation as possible should be left in <br /> place . That portion of the central irrigation canal which would <br /> be removed should be replaced with comparable habitat . The <br /> amount of replacement habitat that should be made available <br /> should be determined in consultation with appropriate state and <br /> federal agencies and should be based upon the concept of no net <br /> loss of either wetlands habitat values or acreage . <br /> Monitoring Agency: Refer to Mitigation Measure No . 2 . <br /> Monitoring Schedule : Refer to Mitigation Measure No . 2 . <br /> 2 <br />