Laserfiche WebLink
Agency Responsible for <br /> Ensuring Compliance : Refer to Mitigation Measure No . 2 . <br /> Reporting Requirements : Refer to Mitigation Measure No . 2 . <br /> Mitigation Measure No . 5 : The proposed lake on the northern <br /> portion of the project site should be designed to include a <br /> portion of the shoreline as wildlife habitat , and plantings along <br /> the shore should be those that support wildlife populations . The <br /> lake should be designed to include a central island and the <br /> island should be planted with native trees and shrubs . <br /> Monitoring Agency : San Joaquin County Planning Division. <br /> Monitoring Schedule : Plantings to be included with, and <br /> planted on-site as part of the project <br /> improvements . <br /> Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Planning Division. <br /> Reporting Requirements : Include habitat plantings as part of the <br /> project Improvement Plans for sign-off <br /> by the Planning Division. <br /> Mitigation Measure No. 6 : The larger fruit , nut and ornamental <br /> trees associated with the existing rural residences located on <br /> the project site should be conserved and protected to provide <br /> cover for wildlife . <br /> Monitoring Agency: San Joaquin County Planning Division. <br /> Monitoring Schedule : Verify retention of trees upon issuance <br /> of the initial project building permits . <br /> Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Building Inspection <br /> Division. <br /> Reporting Requirements : Review during plan check and verify on- <br /> site during building inspection. <br /> Mitigation Measure No. 7 : Wildlife habitat should be preserved <br /> by avoiding the removal of the existing woody vegetation along <br /> the east canal . A setback should be created to form a buffer <br /> between the proposed development and the east canal . <br /> 3 <br />