Laserfiche WebLink
Less Than <br /> Significant After No River Reduced Depth Alternate Quarry <br /> Potentially Significant Impacts Suggested Mitigation Measures Mitigation? No Project Crossing of Excavation Site <br /> Hvdroloav and Water Quality <br /> Excavation into the water table could impact If the water table is intersected by the Yes No Impact Similar Impact No Impact Similar Impact <br /> site drainage, water quality,and future soil extraction pits,and pit dewatering is necessary, <br /> productivity. the California Regional Water Quality Control <br /> Board(RWQCB)shall be notified to evaluate the <br /> proposed disposal of groundwater. A Waste <br /> Discharge Permit or a National Pollution <br /> Discharge Elimination System(NPDES)permit <br /> or may be required from the RWQCB. <br /> If it becomes necessary to extract groundwater <br /> from the excavation pits,an evaluation of the <br /> potential impact on existing local groundwater <br /> wells shall be conducted. The evaluation shall <br /> determine the potential drawdown and arca of <br /> influence of the groundwater extraction and <br /> mitigation for impact to existing wells will be <br /> provided as necessary. <br /> Depending upon the actual groundwater levels <br /> encountered at the gravel extraction site,topsoil <br /> or other material(as approved by the USDA <br /> SCS)shall be added to raise the elevation so that <br /> the root zone of crops will not be subjected to <br /> saturation conditions under the reclamation <br /> plan. <br /> Groundwater Extraction for project water use To ensure that extraction of 10,000 gallons per Yes No Impact Similar Impact Similar Impact Similar Impact <br /> could impact nearby wells. day of groundwater will not impact adjacent <br /> wells,a qualified groundwater hydrologist or <br /> hydrogeologist shall conduct an evaluation of <br /> the potential impact on existing local <br /> groundwater wells. The selection of the <br /> individual or firm to conduct the evaluation <br /> shall be subject to approval by the County and <br /> the California Department of Water Resources. <br /> The evaluation shall determine the potential <br /> drawdown and area of influence of the <br /> extraction from the project well. If it is <br /> determined that project water use could <br /> significantly impact local wells, these wells shall <br /> be monitored for project related drawdown. If <br /> significant adverse impacts to local wells is <br /> identified, mitigation shall be provided such as <br /> deepening or replacement of affected wells. <br />