Laserfiche WebLink
Less Than <br /> Significant After No River Reduced Depth Alternate Quarry <br /> Potentially Significant Impacts Suggested Mitigation Measures Mitigation? No Project Crossing of Excavation Site <br /> Hvdroloav and Water Quality <br /> Hauling of raw materials on site would present Truck loads crossing the project bridge must be Yes No Impact Reduced Impact Similar Impact Similar Impact <br /> hazards of material spills into the Mokelumne fully contained to prevent accidental spill or <br /> River. release of materials into the Mokelumne River. <br /> To minimize the potential impact from potential <br /> spills,an emergency spill containment and <br /> contingency plan shall be submitted to and <br /> approved by the County prior to project <br /> construction. <br /> Bridge relocation could present hazards to If the applicant determines that waterway Yes No Impact No Impact Similar Impact Similar Impact <br /> recreational users of the Mokelumne River. markers(e.g.signs or bouys)are necessary to <br /> warn or advise boaters of hazards during bridge <br /> construction, the markers must be placed or <br /> installed in accordance with the requirements as <br /> specified in Title 14, Article 6,California Code <br /> of Regulations. <br /> Work performed within the Mokelumne River is The applicant shall notify the California Yes No Impact No Impact Similar Impact Similar Impact <br /> subject to review by the California Department Department of Fish and Game of any work, <br /> of Fish and Game. including bridge relocation, in the Mokelumne <br /> river related to this project as required under <br /> Section 1600 of the Fish and Game Code. <br />