My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
0
>
2900 - Site Mitigation Program
>
PR0507793
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:44:39 AM
Creation date
5/8/2020 11:25:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507793
PE
2960
FACILITY_ID
FA0007764
FACILITY_NAME
COUNTY RIGHT OF WAY
STREET_NUMBER
0
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PoV.!ry <br /> COUNTY OF SAN JOAQUIN THOMAS R.FUNN <br /> 2: y <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> MANUEL LOPEZ <br /> P.O.BOX 1810- ALI EASTI A 5201-1 AVENUE DEPUTY DIRECTOR <br /> • STOCKTON,CALIFORNIA 95201-1810 <br /> • C9��FORN;p • 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> TO: San Joaquin County DATE: December 18, 1997 <br /> Public Health Services <br /> 304 East Weber Avenue, Third Floor SUBJECT: THOI TON DRAINAGE <br /> Stockton,California 95201-0388 PROJ ECT,PHASE 5 <br /> Attention: Ms. Mary Mayes TRANSMITTED REWITH: X <br /> UNDER SEPARATE COVER: <br /> No. of Copies Description <br /> 1 PROPOSED SOIL CONTAMINATION CONTAINMENT ACTION PLAN <br /> 1 FGL ENVIRONMENTAL TEST RESULTS FOR EP METHOD 8015M GAS <br /> AND BTEX METHOD EPA 8020 <br /> Remarks: Please review and comment on the Proposed Soil Action Plan. If there are no changes, <br /> please return the original, sign and date your approval. <br /> J <br /> HAI K. LE <br /> F&MINM <br /> HKL:gn <br /> FF-MINM <br /> c: Pete Martin, Senior Civil Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.