Laserfiche WebLink
Page eleven <br /> h <br /> i <br /> 4 <br /> ITEM NO. 23 <br /> Fourteen additional pay items have been added to the Schedule of Prices. <br /> These include twelve "Additive or Deductive Bid"items to establish unit <br /> costs for increasing or decreasing various elements of the original Lump <br /> Sum Bid items. Additionally, two "Alternative Bid"items have also been <br /> included. A revised "Schedule of Prices"is attached. <br /> I <br /> Please replace the original Schedule of Prices DIVISION IV- 6, and 7 pages <br /> with the attached "Revised- 5/97/00"DIVISION IV- 6, 7A, 7B, 7C, and 7D <br /> pages. <br /> All other items remain unchanged. <br /> Addendum No. 2 is hereby acknowledged by the bidder's signature. <br /> Name of Bidder's Company Authorized Signature <br /> Date Title <br /> Approved By: <br /> Ideep Sharma, City Engineer <br /> END OF ADDENDUM NO. 2 <br />