Laserfiche WebLink
A - <br /> Item Estimated Description & Unit Price <br /> No. Quantity (Written in Words-& Figures) TOTAL <br /> 7. 1 LS Demolition of the Corporation Yard $ <br /> Pump House at <br /> Dollars <br /> and cents per Lump Sum <br /> Total "Base Bid" Price at $ <br /> Dollars <br /> and cents <br /> "ADDITIVE OR DEDUCTIVE BID"ITEMS: j <br /> Item Estimated Description & Unit Price <br /> i No. Quantity (Written In Words & Figures) Total <br /> Al. 100 LF Additive or Deductive incremental cost $ <br /> to increase or decrease the Design and <br /> Construction depth of the Production Well <br /> (from the 1,000 feet included in the Lump <br /> Sum of Bid Item No. 1 and includes all of <br /> the associated items of work called for in <br /> the Specifications except for those items <br /> listed here under "Additive or Deductive <br /> Bid" Items) at <br /> Dollars <br /> and cents per Linear Foot <br /> A2. 100 LF Additive or Deductive incremental cost $ <br /> to increase or decrease (from the i <br /> 550 feet included in the Lump Sum <br /> of Bid Item No.1) the amount of <br /> Production Well Blank Casing at <br /> Dollars <br /> and cents per Linear Foot <br /> i <br /> A3. 100 LF Additive or Deductive incremental cost $ <br /> to increase or decrease (from the <br /> 450 feet included in the Lump Sum <br /> of Bid Item No.1) the amount of <br /> i Production Well Wire Wrap Screening at <br /> Dollars <br /> and cents per Linear Foot <br /> DIVISION IV-7A "Revised - 5117100" <br />