Laserfiche WebLink
Item Estimated Description & Unit Price <br /> No. Quantity (Written In Words & Figuresl FiguresTotal <br /> A4. 100 LF Additive or Deductive incremental cost $ <br /> to increase or decrease (from the <br /> 450 feet included in the Lump Sum <br /> of Bid Item No. B1) the amount of <br /> Production Well Full Flow Louver <br /> Screening (instead of Wire Wrap) at <br /> Dollars <br /> " and cents per Linear Foot <br /> A5. 100 LF Additive or Deductive incremental cost $ <br /> to increase or decrease (from the <br /> 700 feet included in the Lump Sum <br /> of Bid Item No.1) the amount of <br /> Production Well Gravel Pack at <br /> a <br /> Dollars <br /> and cents per Linear Foot <br /> A6. 50 LF Additive or Deductive incremental cost $ <br /> to increase or decrease (from the <br /> 300 feet included in the Lump Sum <br /> of Bid Item No.1) the amount of <br /> Production Well Sanitary Seal at <br /> Dollars <br /> and cents per Linear Foot <br /> A7. 20 HRS Additive or Deductive incremental cost $ <br /> to increase or decrease (from the 60 hours <br /> for each Well included in the Lump Sum of <br /> Bid Items No.1 & No. 2) the amount of hours <br /> required to perform Air Lift Swabbing at <br /> Dollars <br /> and cents per Hour <br /> A8. 20 HRS Additive or Deductive incremental cost $ <br /> to increase or decrease (from the 40 hours <br /> for each Well included in the Lump Sum of <br /> Bid Items No.1 & No. 2) the amount of hours <br /> required for Well Development (pumping <br /> and surging) at <br /> Dollars <br /> l and cents per Hour <br /> DIVISION IV-7B "Revised - 5117100" <br />