My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009362
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2900 - Site Mitigation Program
>
PR0518209
>
ARCHIVED REPORTS_XR0009362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 2:47:41 PM
Creation date
5/8/2020 2:32:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009362
RECORD_ID
PR0518209
PE
2950
FACILITY_ID
FA0013759
FACILITY_NAME
PACIFIC BELL
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
02
SITE_LOCATION
10 E 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' In a letter dated June 11, 2002, the SJCEHD requested additional assessment to ascertain the <br /> extent of soil and groundwater impact in the area of the former 2,000-gallon diesel UST A work <br />' plan was submitted to the SJCEHD in July 2002 (IT, 2002c) and subsequently approved by the <br /> SJCEHD on August 9, 2002 The results of the assessment activities are presented in this report <br />' A copy of the letter from the SJCEHD is included in Appendix A <br />' 2.0 Scope of Work <br /> The investigation included advancing six soil borings at select locations on the site Four soil <br />' samples and six grab water samples were collected and analyzed for fuel analytes <br />' 3.0 Work Performed <br /> The work included the following activities <br /> 1 <br /> 3.1 Work Plan, Permitting, and Health and Safety Plan <br />' A work plan was developed to outline procedures for the field investigation Upon review and <br /> approval of the work plan, a permit was issued by the SJCEHD A copy of the permit is included <br /> in Appendix B A representative of the SJCEHD (Mr Michael Infurna) was notified of the <br /> lie proposed drill date A site-specific health and safety plan was developed and reviewed in a <br />' tailgate health and safety meeting, conducted the day of the field work to review safety measures <br /> 3.2 Underground Utility Location <br />' Underground Service Alert(USA) was contacted and notified of the anticipated drilling locations <br /> and date of field activities Additionally, Geotech Utility Locating of El Cerrito, California was <br />' used to locate underground utilities near the anticipated drilling locations <br />' 33 Soil Borings and Sample Collection <br /> On September 19, 2002, Gregg Drilling of Martinez, California, advanced six direct-push soil <br />' borings at the site under the direction of Shaw personnel During advancement of borings <br /> PB-SB-1 and PB-SB-2, extensive pea gravel backfill was encountered in the subsurface Soil <br /> samples were collected from the pea gravel These borings were located along the southern and <br />' northern borders of the former UST excavation, respectively <br />' CNCDIi 1-20-0210 SHAROUST\02-0086 dm 2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.