Laserfiche WebLink
�Y <br /> CAMBRIA <br /> exactly how long we need the wells until they are installed and we can evaluate the groundwater <br /> quality. <br /> As shown on Figure 1, three of the wells are proposed in the sidewalk—two on the east side of <br /> Tracy Boulevard and one on the west side. The fourth well is proposed in the center turn lane of <br /> Tracy Boulevard. <br /> Please reconsider our request for installing the proposed wells. if you have any questions or <br /> need further information please contact me at 707-933-2361. Alternately you can contact Harlin <br /> Knoll, who is the SJCPHS/EHD contact for the work we are being asked to do at this site. Mr. <br /> Knoll's phone number is 209468-3442. <br /> i <br /> Sincerely, <br /> Cambria Environmental Technology, Inca <br /> Joe W.Neely,RG <br /> Senior Project Geologist ti <br /> RG 6927 s <br /> Attachments <br /> Figure 1. Proposed Boring &Well Location Map <br /> cc: Ms. Karen Petryna,Shell Oil Products US <br /> Mr.Harlin Knoll,San Joaquin County Public Health Services <br /> 0813 2 <br />