Laserfiche WebLink
C A M B R I A <br /> REMEDIATION HISTORY <br /> Periodic groundwater extraction (GWE) using a vacuum truck occurred from February 7, 2000 to <br /> September 23, 2003 During this period a total of 206,501 gallons of groundwater were <br /> removed Respective mass removals of total petroleum hydrocarbons as gasoline, benzene, and <br /> MTBE during GWE totaled 5 45,0 102,and 515 pounds <br /> ANTICIPATED FIRST QUARTER 2004 ACTIVITIES <br /> Blaine will gauge and sample the site wells according to the existing sampling schedule and <br /> tabulate the data Cambria will prepare a groundwater monitoring report <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> . Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> �r <br /> Anne Wettstone <br /> Staff Geologist <br /> jlqA� R�D G�fl� <br /> �Q%A <br /> Joe W Neely, RG BOG' FFr J� <br /> Senior Project Geologist <br /> RG 6927 ° No 6927 ° <br /> OF <br /> CAI.IC'O <br /> • <br /> 0813 2 <br />