Laserfiche WebLink
CAMBRIA <br /> cement grout was placed in the well from the bottom: tap, and the well casing was cut off three <br /> feet below grade The cement was allowed to flow over the top of the casing creating a <br /> mushroom cement cap at the well head The remaining excavation was backfilled with native <br /> and potting soil up to the ground surface <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology. Inc. <br /> "�AI <br /> Aubrey K Cool <br /> Project Geologist <br /> MM <br /> Joe W Neely, RG <br /> Senior Project Geologist <br /> Attachments <br /> Figure 1 Site Vicinity Map <br /> Figure 2 Site Map <br /> Appendix A Well Destruction Permit <br /> cc Ms Karen Petryna, Shell <br /> Mr James Barton, Central Valley Regional Water Quality Control Board <br /> i <br /> 0813 2 <br />