My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 11:54:19 AM
Creation date
5/8/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG-20--007 02 :07 PM GETTLER—RYAN INC. 925 551 4770 P. 04 <br /> } <br /> IF, In-Tank Gauging/SIR Equipment: Q Check this box if tank gauging is used only tier inventory control. <br /> El Check lhi�box if no tank gauging or SIR equipment is installed, <br /> This section must be completed if in-tank gauging equipment i• u.ed to perform leak detection monitoring. <br /> Co tete the follo na checklist-, <br /> Yes ❑ No* Has all input wiring been inspected for proper entry and termination. including testing for ground faults.' <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes No* Was accuracy of system product level readings rested? <br /> ❑ Yes ❑ No* Was accuracy of system wetter level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly'' <br /> ❑ Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will he corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if i..Ll)s are not installed. <br /> Com lete the follo inu checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify 11,13 performance? <br /> ❑ N/A (Check all thin apply) Simulated leak rate: ❑ 3 g.p.h.: ❑0 1 g.p.h ; ❑0.2 g.p.h, <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 13 Yes ❑ No* Was the testing apparatus properly calibrated'' <br /> ❑ Ycs No* Cor mechanical LUX does the 1.11)restrict procluct flow if it detects a leak? <br /> ❑ N/A _ _—.-- <br /> ❑ Yes ❑ No* For electronic L.l.Ds.does the turbine automatically shut off ifthe LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LI.Ds,does the turbine automatically shut off if any portion of the monitoring system k disabled <br /> ❑ N/A or disconnected? <br /> ❑ YesEl No* For electronic L.LDs,cities the turbine automatically Out off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test'' <br /> ❑ Yes ❑ No* For electronic UDs,have all accessible wiring connection:been visually inspected? <br /> ❑ N/A <br /> ❑ Yes El No* Were all items on the equipment manufacturer'~maintenance checklist completed? <br /> *in the Section Ii,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: -------__-- ---_-.-- <br /> Page 3 of i u3,�ot <br />
The URL can be used to link to this page
Your browser does not support the video tag.