My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
110
>
2900 - Site Mitigation Program
>
PR0009005
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:04:28 PM
Creation date
5/11/2020 11:15:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009005
PE
2953
FACILITY_ID
FA0004053
FACILITY_NAME
LUSTRE-CAL NAME PLATE CO
STREET_NUMBER
110
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04124048
CURRENT_STATUS
01
SITE_LOCATION
110 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF,CALIFORNIA—HEALTH AND WELFARE AG4Y9. EORGE DEUK EJIAN, Goremor <br /> bEPARTMENT OF HEALTH SERVICES '• <br /> TOXIC SUBSTANCES CONTROL DIVISION ENVIROMENTAL HEALTH :•. , <br /> NORTHERN CALIFORNIA SECTION PERMIT/SERVICES <br /> 4250 POWER INN ROAD April 20, 1987 <br /> SACRAMENTO,CA 95826 <br /> (916)7393145 <br /> Mr. J. A. Kerbs, Executive Vice-President - m <br /> Lustre-Cal Nameplate Corporation <br /> 110 E. Turner Road APR ,-, - <br /> P.O. <br /> PRlJP.O. Box 439 <br /> Lodi, CA 95241-0439 <br /> Dear Mr. Kerbs: <br /> LUSTRE-CAL NAMEPLATE CORPORATION, LODI: SOIL SAMPLING PLAN AND <br /> SEALING OF CONCRETE BUNKER <br /> The Department of Health Services (DHS) has decided on those <br /> matters mentioned in your past correspondence dated 22 July 1985 <br /> and 24 October 1985. Discussion on each point is outlined below. <br /> 1. Proposed bunker sealing procedures and sampling plan <br /> for bunker <br /> The remedial action closure plan submitted together <br /> with the soil sampling program is not adequate and do <br /> not meet the requirements of the Health and Safety Code <br /> Section 25300 et. seq. The underground bunker must be <br /> removed and soil samples will be taken from the area <br /> beneath the tank. These samples must prove that no <br /> leakage of hazardous waste from the removed tank to the <br /> soil has occurred. ) If contamination is found, further <br /> investigation must be done to explore the extent of <br /> contamination to soil and groundwater. A detailed <br /> sampling plan must be submitted specifying number of <br /> samples to be taken, how samples will be collected, <br /> sampling equipmentlused and what analytical test will <br /> be run on each sample. The sampling plan must also <br /> provide for an adequate quality assurance and quality <br /> control program, chain of custody documentation and <br /> analysis by a DHS dertified laboratory. A health and <br /> safety plan for the site investigaiton is also <br /> required. <br /> 2 . Soil sampling Plan for Facilit Parkin Lot and All <br /> Other Areas Where azardous Waste Has Been Disposed. <br /> The parking lot or "turn around area" as well as areas <br /> B,C, and D must be investigated to assess the levels <br /> and extent of contamination. All known or suspected <br /> areas where hazardous waste has been disposed of will <br />
The URL can be used to link to this page
Your browser does not support the video tag.