My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:39:27 PM
Creation date
5/11/2020 1:53:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InitiAlr: <br /> Mr. <br /> Arc <br /> MONITORING AND RESPONSE PLAN - ITE <br /> ARCO PRODUCTS COMPANY FACELITY WITH <br /> SECONDARY CONTAINMENT OF UNDERGROUND STORAGE TANKS WITH SINGLE <br /> WALL PRODUCT LINES <br /> ARCO Facility #6080 Address 85 E. Louise Avenue <br /> Lathrop, CA 95330 <br /> This plan is designed to meet the monitoring and response requirements of Title 23, CCR, Article 3, Section 2632 and <br /> Article 4, Section 2643(c)(2)(B)and (d(1)&(d)(3). <br /> 1. DETECTION METHOD <br /> Tanks-Monthly Inventory Reconciliation and continuous monitor. <br /> Lynes-Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing. <br /> 2. MONTTORIING EQUIPMENT <br /> Secondarily contained storage tanks are monitored by a continuous electronic leak detection system which <br /> consists of an alarm panel, sensors and associated electronics. Liquid sensors are installed in the annular space <br /> of each double will tank. Whenever a sensor detects the presence of a liquid there is both a visual and audible <br /> alarm at the control panel. <br /> Automatic line leak detectors are installed on the single wall pressurized product piping. The line leak detector <br /> will detect a loss of pressure in the product lines and restrict the flow of product. <br /> 3. MAIYTENANCE SCHEDULE OF MONTTORIING EQUIPMENT <br /> The continuous electronic leak detection system including line leak detectors will be inspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 4. MONITORING PROCEDURE- INVENTORY RECONCILIATION <br /> Inventory reconciliation will be performed in compliance with the details of Section 2646, Article 4, Title 23, <br /> CCR (copy attached and hereby incorporated). <br /> A. The daily variation in inventory reconciliation shall be the difference between physically measured <br /> inventory in storage and the calculated inventory in storage. <br /> B. The physically measured inventory shall be determined at approximately the same time each day by <br /> taking liquid level measurement (stick reading)and converting it to gallons using a calibration chart. <br /> C. The calculated inventory shall be determined at approximately the same time of day for each business <br /> day by adding the inputs and subtracting the withdrawals from the physically measured inventory <br /> determined the day before. <br />
The URL can be used to link to this page
Your browser does not support the video tag.