My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 4:39:27 PM
Creation date
5/11/2020 1:53:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. These variations shall be summed for a period of one month. Monthly variations exceeding a variation <br /> of 1.0 percent of the monthly tank delivery plus 130 gallons must be investigated in accordance with <br /> instructions attached. <br /> See Exhibit A for reconciliation form. <br /> 5. MONITORING PROCEDURE-ELECTRONIC MONITOR <br /> On a daily basis the facility operator shall: <br /> A. Inspect the control panel for visual and audible alarm signals to confirm that the unit is operating. <br /> B. Inspect island and tank fill areas for signs of spillage or petroleum sheen. <br /> C. Record the inspection observations on the Daily Visual Monitoring Log (Form APPC-765: attached.) <br /> 6. RESPONSE PLAN - INVENTORY RECONCILIATION <br /> OPERATOR RESPONSIBILITIIES <br /> If the monthly inventory reconciliation exceeds the allowable variation the OPERATOR shall: <br /> A. Verbally notify ARCO Maintenance IMMEDIATELY of a suspected unauthorized release upon <br /> completion of ANY inventory reconciliation which exceeds the allowable variation. Notification to <br /> ARCO must be in sufficient time to allow ARCO to report the suspected unauthorized release to the <br /> local implementing agency within 24 hours of the inventory reconciliation which indicated the <br /> allowable variation was exceeded. <br /> B. Within 24 hours of discovering a variation which exceeds the allowable variation, review the inventory <br /> records for the preceding 30 days and determine if a calculation error exists that caused the apparent <br /> excessive variation. <br /> C. Continue to conduct inventory reconciliation. If a second 30-day period of data confirms the initial <br /> results, notify ARCO Maintenance IMMEDIATELY and record in the monitoring record the action <br /> taken. <br /> NOTE: If prior to month-end daily inventory reconciliations indicate a suspected release, <br /> report it immediately to ARCO Maintenance Do not wait until the end of the month to <br /> rwrt, <br /> ARCO RESPONSIBILITIES <br /> A. Upon notification by the Operator of a suspected unauthorized release, verbally notify the local <br /> implementing agency within 24 hours of discovery by the operator of any inventory reconciliation <br /> which exceeds the allowable variation. <br /> B. Within 24 hours of the notification by the Operator of a suspected unauthorized release, have all readily <br /> accessible facilities carefully inspected for leakage by appropriately trained persons and by following <br /> procedures in ARCO Products Company Procedure G.01. <br /> C. Have all dispenser meters associated with hazardous substance withdrawal checked for calibration <br /> within 24 hours of the inspection in item B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.