Laserfiche WebLink
9. TRAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training needed for the <br /> operation of the tank system and monitoring equipment includes: <br /> How to: <br /> - Take tank level measurements <br /> - Read dispenser meters <br /> - lnspect equipment <br /> - Recognize warning signs: dispenser hesitations, meter spins and odors <br /> - Manually close dispenser impact valve <br /> - Replace dispenser filters <br /> - Shut down the system with and location of: ARCOmatic switch, electrical panel breakers, and <br /> emergency shut off switch <br /> - Test the electronic monitor <br /> 10. RECORDS RETENTION <br /> Written records of all monitoring, testing, and maintenance performed shall be maintained on-site or off-site at a <br /> readily available location for a period of at least 5 years. These records must be made available, upon request <br /> within 36 hours, to the local agency or the Board. <br /> 11. PARTY RESPONSIBLE FOR PERFORMING THE MONITORING <br /> ame Title <br /> 12. PARTY RESPONSIBLE FOR MAINTAINING EQUIPMENT <br /> ARCO MAINTENANCE 80.0-ARCO-FIX <br /> Name <br /> 1/94 <br />