Laserfiche WebLink
F. TANK INSPECTION PROCEDURES TANK NUMPIER <br /> 1 2 3 4 5 <br /> 1.Underwriter Laboratories label or tank serial number(to correspond with in- <br /> voices and UL label on tank.)(U.L.label only appropriate for petroleum tanks) <br /> 2. Tank nominal capacity(gallons). <br /> 3. Tank Measurements(use fill location). <br /> a. Intermediate tank measurements in inches(to help confirm proper <br /> backfill and ballast procedures). <br /> (1 After pressure test,measure tank internal diameter prior to back- <br /> filling (see I below). <br /> (2� After backfill is to top of tank,measure from tank bottom tob o tto m <br /> of fitting(see I below). <br /> (3) Calculated tank deflection with backfill at tank top(subtract measure- <br /> ment a2 from measurement a1).Refer to Table A for max.deflection. <br /> b. F1nal Tank Measurements in inches(to help confirm tank has proper <br /> support). <br /> (1) Initial tank measurement (from a1). <br /> (2� After backfill is at subgrade (prior to surface pad),measure from <br /> tank bottom to top of fill tube(prior to installation of drop tube)(see U <br /> below). <br /> (3 Measure from bottom of fitting to top of fill tube(see III below). <br /> (4 Calculate tank internal diameter(subtract measurement b3 from b2). <br /> (5) Tank deflection(subtract measurement b4 from b1).Refer to Table A. <br /> Measu ement Instructions <br /> All meas,rements for vertical deflection are made from the bottom of the tank to the bottom of the fitting. <br /> All meas rements should be made in inches using a standard nonmetallic gauge stick. <br /> All measurements should be made through the fill fitting (use the same fitting for all measurements). <br /> I Measurement I is the inside diam- WARNING: If the answer in either measurement a3 <br /> READ IWA e\ eter of the tank at the gauge opening. or b5 is in excess of the appropriate value shown in <br /> Measure from the bottom of the tank Table A, immediately contact Tank Technical Support <br /> to the bottom of the fitting.This mea- (936-756-7731)prior to proceeding with the installation. <br /> surement should be taken prior to <br /> placing any backfill. Table A <br /> WASURE ENT 1 Tank Maximum <br /> Measurement II is the distance from Diameter Deflection <br /> II the bottom of the tank to the top of <br /> 449 <br /> 314- <br /> ,, the fill tube.This measurement should 8. 1-1i4• <br /> be taken prior to insertion of the drop 10' 1-12" <br /> tube. Backfill should be to subgrade 12' -12 <br /> at this time. <br /> Installation was in accordance with Fluid Products Installation <br /> Measurement 111 is the distance from <br /> Instructions Pub.No. INST 6001. <br /> III the bottom of the fitting to the top of <br /> the fill tube. This measurement is Owner's Representative Title <br /> taken by driving a nail into the 1"point <br /> at a right angle to the gauge stick. - — - <br /> ,,,� Contractor's Representative <br /> Lower the gauge slick down the fill <br /> WASUREMEW tube far enough to extend below the Notary Public (Optional) Date <br /> bottom of the fitting. Lift the gauge NOTE: Owner must retain this document to substantiate any <br /> stick until the nail catches on the lip future structural warranty claim. <br /> of the fitting. Read measurement at <br /> the top of the fill pipe. Subtract 1"to Tank Technical Support(936)756-7731 <br /> allow for the point where the nail is in <br /> the gauge stick. <br /> Copyright®2001 Containment Solutions,Inc. -All Rights Reserved- Litho U.SA -GP/5M/2-01 -Pub.No.INST6002D <br />