My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assembling Kit Components onto Probe Assembling Floats onto Probe Shaft <br /> Assembling Floats onto Probe Shaft <br /> The Product Float, Ethanol /Water Float assembly and the White Boot must be assembled on the probe shaft in <br /> the exact sequence and orientation shown in Figure 3. <br /> IMPORTANT! <br /> Failure to push the boot as far as possible onto the probe shaft could cause the boot and float(s)to <br /> fall into the tank.The boot must be pushed on until it"locks"on the probe shaft. <br /> Handle the probe carefully. Striking or dropping the probe will result in loss of calibration and could cause <br /> permanent damage. <br /> 4-inch <br /> I=, ✓Product Float- <br /> I slide on probe <br /> shaft first. <br /> I I I <br /> i <br /> UPEthanol/Water Float Ass'y- <br /> slide on probe shaft second. <br /> i <br /> I <br /> I I <br /> I I <br /> I I White Boot- <br /> I I <br /> slide on probe <br /> I I shaft last <br /> I <br /> J006-3.eps <br /> I <br /> Figure 3. Example installation of Probe Floats and White Boot <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.