My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overfill Alarm/Ack Switch Installation Guide Mounting Instructions <br /> 3"(76.2 mm) 0.313"(8 mm)dia. 2"(50.8 mm) TEST button <br /> 4 holes (on side) <br /> -- <br /> I <br /> ACKNOWLEDGE <br /> Hinge • <br /> side <br /> conduit RESET 6.75" <br /> connector 0 (171.5 mm) <br /> �OT <br /> 1.4" <br /> (35.6 mm) <br /> 1 <br /> —> 1"(25.4 mm) E <br /> 2"(50.8 mm) <br /> consolesleck—eps 4.3"(109.5 mm) <br /> Figure 2.Acknowledgement Switch mounting dimensions <br /> Mounting Instructions <br /> OVERFILL ALARM <br /> 1. Select a mounting location where the Overfill Alarm can be seen and heard clearly from the area where the fuel tanks <br /> are filled. In addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 1. <br /> 3. Mount the Overfill Alarm using the four mounting tabs on the housing. <br /> ACKNOWLEDGEMENT SWITCH <br /> 1. Select a mounting location where the Acknowledgement Switch can be easily activated by the tank truck driver.In <br /> addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 2. <br /> 3. Mount the Acknowledgement Switch using the four mounting tabs on the housing. <br /> 4. Install conduit between the Acknowledgement Switch,Overfill Alarm,and TLS Console. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.