Laserfiche WebLink
Wiring Instructions <br /> IMPORTANT! Wire used for this installation must have a temperature rating of at least 90°C.be either 14 or 16 AWG, <br /> and be color coded. Splicing alarm power with TLS Console power will cause improper operation of the monitor. <br /> Wiring Overfill Alarm with Acknowledgement Switch <br /> 1. Pull two wires from the switch to the Overfill Alarm. <br /> 2. Pull two wires for line and neutral from the switch to the power panel. <br /> 3. Pull one wire from the switch to the TLS Console for connection to the alarm relay. <br /> 4. Pull one wire for line from the alarm relay in the TLS Console to the power panel. <br /> 5. Turn power Off and connect wiring according to the wiring diagram in Figure 3 and Ta le 1. <br /> N <br /> Overfill Alarm <br /> (cover open) <br /> Horn Time <br /> Delay Relay <br /> Ack Switch <br /> (cover open) <br /> To Console Relay- ® a <br /> See Console Connection <br /> M <br /> Table in this manual ® a <br /> -- - <br /> Customer supplied <br /> junctionbox ------------------------------------------- <br /> consoie\ovakw,,eps N L <br /> To power panel <br /> Figure 3.Overfill Alarm/Acknowledgement Switch wiring connections <br /> 5 <br />