My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 4:43:08 PM
Creation date
5/11/2020 2:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2011
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wiring Instructions <br /> IMPORTANT! Wire used for this installation must have a temperature rating of at least 90°C.be either 14 or 16 AWG, <br /> and be color coded. Splicing alarm power with TLS Console power will cause improper operation of the monitor. <br /> Wiring Overfill Alarm with Acknowledgement Switch <br /> 1. Pull two wires from the switch to the Overfill Alarm. <br /> 2. Pull two wires for line and neutral from the switch to the power panel. <br /> 3. Pull one wire from the switch to the TLS Console for connection to the alarm relay. <br /> 4. Pull one wire for line from the alarm relay in the TLS Console to the power panel. <br /> 5. Turn power Off and connect wiring according to the wiring diagram in Figure 3 and Ta le 1. <br /> N <br /> Overfill Alarm <br /> (cover open) <br /> Horn Time <br /> Delay Relay <br /> Ack Switch <br /> (cover open) <br /> To Console Relay- ® a <br /> See Console Connection <br /> M <br /> Table in this manual ® a <br /> -- - <br /> Customer supplied <br /> junctionbox ------------------------------------------- <br /> consoie\ovakw,,eps N L <br /> To power panel <br /> Figure 3.Overfill Alarm/Acknowledgement Switch wiring connections <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.