My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:32:06 PM
Creation date
5/12/2020 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C .� � 0 <br /> AR an cts Com a.0 <br /> h Y . 0 <br /> 5 . <br /> 0 <br /> O irc w � <br /> Dispenser and Piping Replacement U1101 <br /> co o � <br /> Vorn <br /> ° a � <br /> - 4 p <br /> 0 <br /> GENERAL NOTES: COMPLIANCE NOTES: DRAWING LIST N <br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR - - O <br /> ARCO TANK DRAWINGS (TK-SERIES) AND ARCO MASTER CONSTRUCTION - REFERENCING ALL DIMENSIONS., PROPERTY LINES, ELEVATIONS AND EQUIPMENT T-1 - COVER SHEET SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). LOCATIONS. 0 <br /> B. THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED f0 ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE C1-1 - . DEMOLITION SITE PLAN U Y <br /> BE AN EXACT REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO CA1-1 - MISCELLANEOUS SITE DETAILS Cd <br /> SHALL RELOCATE MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTENT THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE TK1-1 - PETROLEUM PIPING PLAN / <br /> WITH THE INTENT OF THE DESIGN, THE GENERAL CONTRACTOR SHALL PREPARE PROCEEDING WITH THE WORK, V <br /> AS-BUILT PLANS AT THE COMPLETION OF THIS JOB. TK-2 DEMOLITION PLAN AT TANK .SLAB - <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF TK-3 - INSTALLATION PLAN #2 AT TANK SLAB <br /> C. INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS INDUSTRIAL SAFETY, STATE OF CALIFORNIA , FOR EXCAVATIONS OF TRENCHES y,. <br /> TK3-1 - PIPING REPLACEMENT - SUMP & -VENT PIPING <br /> AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL � 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br /> CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. - INSTALLATION DETAILS <br /> AND LOCAL REQUIREMENTS. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING TK3-2 PIPING REPLACEMENT - SIPHON PIPING- cd <br /> - <br /> D. ARCO SHALL PERFORM LINE TESTING AND AIR QUALITY <br /> PRIOR TO TANK INSTALLATION.TY TESTING. - TK3-3 - PIPING REPLACEMENT - PIPING INSTALLATION O_ <br /> CONTRACTOR REPRESENTATIVE SHALL BE PRESENT DURING TESTING. TANK .SYSTEM TO BE INSPECTED BY GOVERNING AGENCY AND ARCO ENGINEER AT - ..DETAILS AT MULTI-PRODUCT DISPENSERS (Id <br /> FOUR (4) SEPARATE CONSTRUCTION PHASES AS REQUIRED: <br /> E. FENCE JOB SITE WITH s FT HIGH CHAIN LINK FENCE DURING -TK3-4 - PIPING REPLACEMENT .- TYPICAL MULTI--PRODUCT J <br /> CONSTRUCTION. 1, PRIMARY PIPING HYDROSTATIC ALLY OR PNEUMATICALLY TESTED FOR 30 DISPENSER INSTALLATION DETAILS <br /> MwuT€s• TK3-5 TANK SLAB, ANCHORING AND MARKING DETAILS <br /> F. UTILIZE EXISTING ELECTRICAL/SIGNAL CONDUIT WHEREVER POSSIBLE. � - d�. <br /> REPLACE/ALTER/INSTALL NEW CONDUIT AS REQUIRED. REPLACE DETERIORATED 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN TK4-1 - .PIPING REPLACEMENT - VEEDER-ROOT LEAK DETECTION 0 <br /> CONDUIT AS REQUIRED. ACCORDANCE WITH MANUFACTURER'S GUIDELINES. <br /> AND MPD DISPENSER DIAGRAM W/ BROWN. BOX <br /> G. CONTRACTOR SHALL TOUCH-UP PAINT AS REQUIRED. 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION (GILBARCO B78 BASED) - 0 <br /> H. REPLACE ALL DISPENSER FILTERS UPON JOB COMPLETION. <br /> SYSTEM. TK4-3 - PIPING REPLACEMENT - MATERIAL LIST, ABBREVIATIONS, <br /> U <br /> ALLTANKSUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE TANK ORIENTATIONS AND GENERAL NOTES. `V <br /> 1. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED - HYDROSTATIC ALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS - <br /> OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION, TO INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE ARCO FIELD ENGINEER Ln <br /> �S �iU IL ( Fel XY�S OO WILL <br /> SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION TEST CHECKLIST ^, W <br /> �r - a� P2oVlD� Tc, J. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. BEFORE CONTRACTOR L BE PAID. VJ W <br /> �-� T�' C'sF-0�� IT�1PcL A TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS Q <br /> ��R�V�IL Z-5 GIVc Aj K. INSTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.J.) IN ALL NEW FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM � � <br /> CONCRETE WORK AS SHOWN AND REQUIRED. BEING PLACED IN OPERATION. - C c <br /> TO ��MINV�,I�'T SIG L. UNDERGROUND WIRING SHALL BE INSTALLED IN THREADED RIGID METAL PIPE AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND W <br /> ..'��� PER N.E.C. 514-8. EXCEPTION NO. 2 PERMITS NON-METALLIC CONDUIT IF APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS. •Q z <br /> _ BURIED 24 INCHES DEEP WITH GROUND WIRE AND AT LEAST 24 INCHES OF EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING <br /> d ALL SP�GCTc9tJ5 RtfpUjQC qje fffp l}DVAvj ���GC METAL CONDUIT IS INSTALLED UNDERGROUND. AGENCY. � .+. Q <br /> 10 O}-' A'1LlGW'�TC3h� .t..Q2 Qt�UI M. ALL UNDERGROUND ELECTRICAL CONDUIT RISERS SHALL BE PVC COATED ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE Wz <br /> RIGID GALVANIZED STEEL TO A DEPTH OF 24 INCHES BELOW GRADE. ALL _ e <br /> S?J Sit=C'T'T O S ELECTRICAL CONDUIT BURIED 24 INCHES DEEP SHALL BE SCHEDULE 40 PVC. AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING C :D m <br /> AUTHORITIES. (d z O i. <br /> AU-TC�V�'VA'T1C. i�UO'l� 5j�.'(f'(� p(� N. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL - �f,f LL o . <br /> MUST 'Z)ft F� f}(-,(_ THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE n <br /> J DISCONNECT ,ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PER J <br /> '���m�T.S S O+- Z��(o`Fa, O'i✓ C,�.I� 01� / jN.E.C. 514-5.. PRODUCT STORED. - 4) Q Q wr o <br /> L1til T]GH' L'"SS 5T"S W ILL, 'gam- ��4V (1�G� 0. IF STRONG ODOR OF GASOLINE OR DIESEL FUEL IS PRESENT IN EXCAVATED "`co W U v <br /> _L�)E yr FOR 'P n1V T RIEz�U P ,—�,) MATERIALS, STOCKPILE CONTAMINATED MATERIALS ON PLASTIC FILM AND COVER C ? L <br /> WITH SAME. NOTIFY ARCO ENVIRONMENTAL ENGINEERING FOR DISPOSAL. u <br /> q".S COORDINATE ALL ENVIRONMENTAL MATTERS WITH: PAUL SUPPLE, ARCO a: <br /> ENVIRONMENTAL ENGINEERING. PHONE: (510) 299-8891. PROVIDE ALTERNATE O cr- <br /> P y P >J A'N� MUSS' BID ITEM: UNIT COST ($/CUBIC YARD) FOR OVER-EXCAVATION WORK. —I T y`o <br /> - <br /> SUM A�.1 -PLBYFJ5 � �17� ; <br /> " _ Q <br /> 0 _5 co <br /> 0 o <br /> POV z .Q . <br /> < id �p � <br /> Q 7 0 � M <br /> L <br /> master release date <br /> NO. DATE REVISIONS PROJECT RELEASE proj. eze. drawn by <br /> _— --_— - _--_ _- 7/29/99. 0,0. <br /> PERMIT _ <br /> _ protect / facility -- - <br /> BID 6080 <br /> - et -- <br /> CONST. heet <br /> AS-BUILT --�-- T-1 <br /> of <br /> AR995/995CVR.DWG <br />
The URL can be used to link to this page
Your browser does not support the video tag.