My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:32:06 PM
Creation date
5/12/2020 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aid kki,- <br /> > T � ' 0 <br /> C .� �' O <br /> ARCO Products Company � � ° <br /> O 1 W cno <br /> Dispenser and Piping Replacement a <br /> QCd <br /> oW <br /> GENERAL NOTES: COMPLIANCE NOTES: DRAWING LIST �, N <br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR <br /> i ARCO TANK DRAWINGS (TK SERIES) AND ARCO MASTER CONSTRUCTION REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT +•. yy <br /> COVER SHEET <br /> SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). LOCATIONS. T-1 - <br /> CI-1 — DEMOLITION SITE PLAN U ,L <br /> B. THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO ALL DIMENSIONS AND CONDITIONS SHALL 6E CHECKED AND VERIFIED IN THE <br /> BE AN EXACT' REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO CAI-1 - MISCELLANEOUS SITE DETAILS <br /> SHALL RELOCATE MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTENT THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE TK1-1 - PETROLEUM PIPING PLAN <br /> WITH THE INTENT OF THE DESIGN. THE GENERAL CONTRACTOR SHALL PREPARE PROCEEDING WITH THE WORK. <br /> TK-2 DEMOLITION PLANSLAB <br /> AS-BUILT PLANS AT THE COMPLETION OF THIS Joe. . AT TANK. Q — ; <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF TK—3 INSTALLATION PLAN #2 AT TANK SLAB •Cd <br /> C. INSTALL (CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS INDUSTRIAL SAFETY, STATE OF CALIFORNIA , FOR EXCAVATIONS OF TRENCHES %�TK3'-1" — PIPING REPLACEMENT' - SUMP"k VENT (PIPING <br /> AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. j INSTALLATION. DETAILS - - �/+-' - <br /> CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. `AND LOCAL REQUIREMENTS. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING TK3-3 PIPING REPLACEMENT - PIPING INSTALLATION n <br /> AGENCY PRIOR TO TANK INSTALLATION. ( LL <br /> D. ARCO SHALL PERFORM LINE TESTING AND AIR QUALITY TESTING. DETAILS AT. MULTI-PRODUCT DISPENSERS f <br /> CONTRACTOR REPRESENTATIVE SHALL BE PRESENT DURING TESTING. TANK SYSTEM TO BE INSPECTED BY GOVERNING AGENCY AND ARCO ENGINEER AT TK3 4 — PIPING REPLACEMENT - TYPICAL. MULTI--PRODUCT J <br /> FOUR (4) SEPARATE CONSTRUCTION PHASES AS REQUIRED: DISPENSER INSTALLATION DETAILS <br /> E. FENCE JOB SITE WITH 6 FT. HIGH CHAIN LINK FENCE DURING - <br /> CONSTRUCTION. 1.M PRIMARY PIPING HYDROSTATIC ALLY OR PNEUMATICALLY TESTED FOR 30 ( <br /> MINUTES. / TK3 5 — TANK SLAB, ANCHORING AND MARKING DETAILS <br /> F. UTILIZE EXISTING ELECTRICAL/SIGNAL CONDUIT WHEREVER POSSIBLE. 1 TK4-1 - PIPING REPLACEMENT - VEEDER ROOT LEAK DETECTION I ^` <br /> REPLACE/ALTfER/INSTALL NEW CONDUIT AS REQUIRED. REPLACE DETERIORATED 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN I ` AND MPD: DISPENSER DIAGRAM (SCHLUMBERGER BASED) 4/ <br /> CONDUIT AS REQUIRED. ACCORDANCE WITH MANUFACTURER'S GUIDELINES. c <br /> `` TK4-3 — PIPING REPLACEMENT — MATERIAL LIST; ABBREVIATIONS, \( E <br /> G. CONTRACTOR SHALL TOUCH-UP PAINT AS REQUIRED. 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION J TANK ORIENTATIONS AND GENERAL NOTES. ,1 0 <br /> ' SYSTEM. J <br /> H. REPLACE: ALL DISPENSER FILTERS UPON JOB COMPLETION. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BECd <br /> I. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED HYDROSTATIC ALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS <br /> OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION. TO INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE ARCO FIELD ENGINEER <br /> MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION TEST CHECKLIST LO <br /> PAID. <br /> J. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. BEFORE CONTRACTOR WILL BE - M <br /> TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS LL• Q <br /> K. INSTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.J.) IN ALL NEW FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM TZ1 <br /> CONCRETE WORK AS SHOWN AND REQUIRED. BEING PLACED IN OPERATION. V� <br /> C <br /> L. UNDERGR2OUND WIRING SHALL BE INSTALLED IN THREADED RIGID METAL PIPE AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND ^ <br /> PER N.E.C. 5)14-8. EXCEPTION NO. 2 PERMITS NON-METALLIC CONDUIT IF APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS. <br /> BURIED 24 INCHES DEEP WITH GROUND WIRE AND AT LEAST 24 INCHES OF EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNINGz <br /> - <br /> METAL CONDUIT IS INSTALLED UNDERGROUND. AGENCY. �• Z Q . <br /> M. ALL UNDERGROUND ELECTRICAL CONDUIT RISERS SHALL BE PVC COATED ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE <br /> ELECTRICAL CONDUIT BURIE + Z <br /> RIGID GALVANIZED STEEL E A DEPTH OF 24 INCHES BELOW GRADE. ALLD 24 INCHES DEEP SHALL BE SCHEDULE 40 PVC. AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING - W O <br /> AUTHORITIES. <br /> Z LLN. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL <br /> DISCONNECT ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PER THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE � <br /> - a <br /> N.E.C. 514-5. <br /> PRODUCT STORED. Q U o <br /> 0. IF STRONG ODOR OF GASOLINE OR DIESEL FUEL IS PRESENT IN EXCAVATEDco 3 <br /> MATERIALS, STOCKPILE CONTAMINATED MATERIALS ON PLASTIC FILM AND COVER f C � <br /> WITH SAME. NOTIFY ARCO ENVIRONMENTAL ENGINEERING FOR DISPOSAL. Q <br /> COORDINATE ALL ENVIRONMENTAL MATTERS WITH: PAUL SUPPLE, ARCO <br /> ENVIRONMENTAL ENGINEERING. PHONE: (510) 299-8891. PROVIDE ALTERNATE 0. 0 <br /> BID ITEM: UNIT COST ($/CUBIC YARD) FOR OVER-EXCAVATION WORK. - �_ -1 �-- �' 9 <br /> 0 0 J UO <br /> 0 N1 <br /> PZW � � x <br /> OU iQi. . <br /> ® :5 o m6 <br /> ONNU t�nb NDN >. <br /> U1 � <br /> master release release date <br /> - NO, DATE REVISIONS PROJECT ,RELEASE prof. exe. drawn by <br /> - J9/02L`j9 IJFI FTI SHEE( IK � i v iUR N-4 <br /> PERMIT <br /> _ project / 'facility <br /> BID 6080 <br /> CONST. sheet Is <br /> AS-BUILT of <br /> If AR995/995CVR.DWG <br />
The URL can be used to link to this page
Your browser does not support the video tag.