Laserfiche WebLink
- - DEMOLITION LEGEND & DEMOLITION KEY NOTES: <br /> CONCRETE.TO ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS <br /> A, REMOVED ,NOTED OTHERWISE, THE'.CONTRACTOR SHALL MAINTAIN AND Ad <br /> BE <br /> �— E REMOVED PAVING io PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND <br /> B ' <br /> COLUMN SHROUDS IN PLACE. <br /> PL = 208.5' I � �� � PIPING TO BE '.. <br /> T� '''���PPP REMOVED EXISTING PRODUCT AND VAPOR RECOVERY PIPING IS <br /> _ PIPING TO BE SHOWN SCHEMATICALLY ONLY. CONTRACTOR MUST VERIFY <br /> /� ABANDONED <br /> h, PLANTER 5 PIPING LOCATIONS AND CONFIGURATION IN FIELD, <br /> (E) TANK SLAB <br /> CONTRACTOR <br /> P.I.C. ND <br /> AR SHALL <br /> I.C.R. UNITS MAINTAIN' IAND N PLACE. OT EXISTING <br /> A <br /> P� <br /> CONTRACTOR SHALL SAWCUT,: REMOVE AND DISPOSE, OF Q •G '� 0 <br /> LiEXISTING A.C. PAVING PORTION "ENTIRE CONCRETE DRIVE cocV L Q, <br /> — — — — — — — — — — — — — "- — — — — — SLAB AS REQUIRED INDICATED ON DRAWING. CONTRACTOR /^� <br /> - - - <br /> SHALL MAINTAIN AND PROTECT EXISTING CANOPY <br /> SAWCUT LINE � . j. <br /> COLUMNS, FOOTINGS AND CANOPY DOWN SPOUTS IN �',` C �+ Q <br /> _ l,.t-.i" ��i - _ - PLACE.. CONTRACTOR SHALL REPAIR .AND/OR REPLACE : E. . <br /> r \ 0 <br /> (3) (E) U.G. 12K GAL -I \_ <br /> STORAGE TANKS - --- -h - I --1 ---I — - f -' -- III CANOPYORUCTION SPOUT LEADER IF DAMAGED DURING O <br /> CONSTRUCTION. W a <br /> I I p I (S ( CONTRACTOR SHALL PROTECT AND MAINTAIN EXISTING " V <br /> / I I 9 89 i " A.T.M. MACHINE IN PLACE, PROTECT EXISTING P.I.C. -0 +� <br /> I 1,;" 8 [ MACHINE PIPE BOLLARDS AND FOOTINGS IN PLACE. `t C <br /> coca <br /> �1 j — (E) U.G. VENT PIPING TO REMAIN O CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING ♦'� 0 " 4/ <br /> PRODUCT DISPENSERS AND ASSOCIATED HARDWARE AND <br /> i <br /> J EQUIPMENT, TYPICAL, OF 8, AS DIRECTED BY ARCO m CY <br /> �� I \1Yr i If 1 \1,41 /1 I ` YI .\ ENGINEER.'- <br /> g r�r�tfil <br /> 7 ril Y/ i Ij ® CONTRACTOR SHALL BREAKOUT AND REMOVE EXISTING Q <br /> ,\ / I�I\ 1ly! / /�// -_ �' 1 0 � FROD GST, VAPOR R ISLANDS TYPICAL OF 4. <br /> O T <br /> 1_. CONCRETE DISPENSE <br /> CONTRACTOR SHALL LOCATE AND REMOVE ALL EXISTING j <br /> RECOVERY PIPING AND ASSOCIATED ■ <br /> ✓�1-! AND ACCESSORIEco <br /> S. <br /> t _ _ _ I {-� 1 O$ - CONTRACTOR SHALL SAWCUT AND REMOVE EXISTING A.C. W <br /> ARCO FACILITY # 6080 PAVING AS REQUIRED BY NEW WORK. CONTRACTOR SHALL ® � O <br /> {' GROSS BUILDING AREA: SAWCUT ,AND REMOVE PORTION OF CONCRETE TANK SLAB <br /> LAJ1,843 SO. FT. AS REQUIRED BY NEW WORK. <br /> © CONTRACTOR SHALL. EXCAVATE AS REQUIRED TO EXPOSE L <br /> TANK TOP. REMOVE AND DISPOSE EXISTING TURBINE, cc <br /> TURBINE SUMP. CAP AND SEAL ALL UNUSED BUNG <br /> i I I OPENINGS. .TYPICAL OF 3 TANKS. - <br /> I <br /> -{ � i 0 CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL •RS <br /> _ v EXISTING PRODUCT- AND VAPOR RECOVERY PIPING <br /> i <br /> N <br /> p z <br /> I I I i I 9 11 - PROTECT. EXISTING ELECTRICAL CONDUITS IN PLACE FOR <br /> (E) BUILDING SIDEWALK REUSE .TYPICAL OF 3 TANKS. !� <br /> u <br /> a � � (E) U.G. PRODUCT PIPING—_1 . <br /> lJ®d a ®. CONTRACTOR SHALL REMOVE AND DISPOSE OF A PORTION 4 <br /> I � OF THE EXISTING TANK VENT PIPING AS REQUIRED BY. NEW �3s <br /> .WORK. MAINTAIN AND PROTECT REMAINING PIPING AND <br /> l • o VENT RISER'S IN . PLACE FOR REUSE. <br /> 9O REMOVE EXISTING OWNERS CORNING HYDROSTATIC MONITOR <br /> SYSTEM AND VEEDER-ROOT LLD-300. SALVAGE AS <br /> I I o. D1R�CT¢D.,BY,,ARGtr-.ENGINEER: _ _ `:W <br /> { 11 <br /> 9 I F { 2 (E) PRODUCT DISPENCERS I <br /> AND CONCRETE ISLAND (TTP.) 10 \CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL <br /> I - \(EXISTING VAPOR RECOVERY PIPING AS INDICATED. MAINTAI� ^` <br /> ".i ND PROTECT REMAINING PIPING IN PLACE FOR R <br /> �' EUSE. <br /> CONTRACTOR S�ACL REMOVE <br /> r r EXISTING' ANNULAR.SPAOE z <br /> .l- I- l MANWAY, RISER, HYDROSTATIC SENSOR AND ALL RELATED <br /> d /�_ JT/ ,r/. [ y - 1 O PIPING AND ACCESSORIES. EXCAVATE AS REQUIRED TO <br /> I C ,. 1•y ' (�� f,+� / ( l.�,r� 7 REMOVE HYDROSTATIC PIPING. REMOVE ALL RELATED <br /> �f_ .,J/�/ EQUIPMENT AND ACCESSORIES FROM BUILDING. TYPICAL OF <br /> . 1 /..—!,." 3 TANKS. MAINTAIN AND PROTECT FIBERGLASS TANK <br /> RESERVOIR IN PLACE. - - � <br /> 4 10 <br /> Lll <br /> II [ I 2 <br /> Co <br /> �W rrr I W <br /> y� � <br /> L <br /> 3 4 10 ,. °a. <br /> >W Q I- <br /> s� Q U __ . <br /> •s. <br /> Ca W � <br /> \ 0) cf) O O <br /> � o <br /> C O <br /> \ • <br /> UNAUTHORIZED CHANGES AND USES: The origin ser prep ring t e _J <br /> plans will not be responsible for, or liable for; unauthor d PLANTER a_ 00 J Q . O <br /> changes to or uses of these plans. All changes plans t b <br /> In writing and must be approved by the preparer of these a <br /> PLANTER <br /> Construction contractor agrees that in accordance with generally — — — — — — — — — — — — — <br /> accepted construction practices, construction contractor will be <br /> required to assume sole and complete responsibility for job site PL = 203.0' <br /> conditions during the course of construction of this project, <br /> Including safety of all persons and property, that this requirement - <br /> shall be made to apply continuously and not limited to normal a <br /> working hours, and construction contractor further agrees to z � �; <br /> defend, Indemnify and hold design professional harmless from any - W ti x <br /> and all liability, real or alleged, in connection with the performance - vi2 '6 W <br /> of work on this project, excepting liability arising from sole PO a 2 m d a <br /> negligence of design professional. 1 . - < W . ,a <br /> Demolition note: <br /> Q 8 N N <br /> This demolition plan isnot intended to, and does not, determine-the <br /> Engineers Note to Contractor: - method, details, and means of performing the demolition. This plan " v� o ' <br /> The existence and location of any underground utilities, pipes, makes noinquiry or determination': as to the existence 'of and . zo u <br /> and/or structures shown on these plans were obtained by a - hazardous or toxic materials existing on. the site or in the buildings. a o M0 U. a, m <br /> search of available records. To the best of our knowledge, there „ It Is recommended that an independent investigation be. performed <br /> are no existing utilities except as shown on these plans. The - prior to demolition to: determine theexistence of any potential master release date <br /> contractor shall ascertain the true vertical and horizontal location GRA <br /> + Ap L[./ _ hazardous or toxic risk shown .or:not shown hereon. - <br /> and size of those to be used of any underground utilities and - ` 7RiY/ �l�C lv+G+A/ IC <br /> shall be responsible for any damage to any public or private L.. . <br /> utilities, shown or not shown hereon. - tp y N ; DATE �'� REVISIONS PROJECT RELEASE proj: exe. drawn by <br /> IMPORTANT NOTICE 1 7/30/99 . REV PIR CLIFNr cOM�rFNTs PERMIT ppc/Cnp : <br /> Sectio 217 of the Government.Code requires ( IN FEET) 2 9/01�d9 RFV PER CLIENT CCMNFN1S projeat / facility <br /> Section Alert <br /> i 4 i Inch = 10 feet 6080 <br /> a Dig Alert identification Number be Issued before a - <br /> Permit to Excovate will be valid. For your Dig Alert - BID <br /> ID Number Call „ <br /> UNDERGROUND SERVICE ALERTsheet / fife <br /> 1-800-227-2600 CONST, — <br /> For Underground Locating, 2 working days before you dig, `/ AS–BUILT r 1 <br /> of <br /> AR995/995/995C1-1DWG <br />