My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
SITE HISTORY_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:16:07 PM
Creation date
5/12/2020 1:57:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
FileName_PostFix
CASE 1
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1.0f 1 <br /> Harlin Knoll [EH] ` <br /> i <br /> From: Harlin Knoll [EH] <br /> Sent: Tuesday, August 31, 2010 11:01-AM <br /> To: 'Chris Strong' <br /> Cc: Adrienne Ellsaesser[EH]; Nuel Henderson [EH]; Mike Infurna [EH] <br /> Subject: RE:LOP Site#1282124 -WGR modification request- <br /> Chris: <br /> The additional sampling of MW3-6 and MW3-9 is approved. Nuel.Henderson recommended immediate <br /> resampling of these MWs to confirm the ground water results for the lastest round and then go to quarterly <br /> sampling, if appropriate. <br /> Postponement of injection in this area seems-warranted, until,more data is available and reevaluated. <br /> HARLIN KNOLL <br /> SAN JOAQUIN COUNTY/EHD <br /> 600 E MAIN STREET <br /> STOCKTON, CA 95202 <br /> (209)468-3442 <br /> FAX: 468-3433 <br /> From: Chris Strong [mailto:cstrong@wgr-sw.com] <br /> Sent: Tuesday, August 31, 2010 10:08 AM <br /> To: Harlin Knoll [EH] <br /> Ce: 'Jim Neal WGR' <br /> Subject: Third Quarter UST#3 Sampling and Remediation Activities <br />'h Hi Harlin, in follow-up to our phone conversation this morning,.I just wanted to confirm county approval for <br /> the details we discussed regarding the UST#3 site at the Port of Stockton (T0607711817). In response to <br /> our 8120110 letter to the county, you said you were OK with the sampling of the two extra wells; MW3-6 and <br /> MW3-9, this quarter in addition to the MW3-8 well,which we have already been sampling on a quarterly <br /> basis. This is in order to better assess downgradient natural attenuation trends and temporarily hold back <br /> i on installing the downgradient dissolved oxygen injection system unless natural attenuation proves <br /> insufficient. We will plan to go ahead and sample wells MW3-6, MW3-8 and MW3-9 this quarter and will <br /> still be installing the Ozone-Peroxide Pilot system at the core of the plume, as approved in the 7130110 <br /> SJCDEH comment letter. <br /> L Regards, <br /> Chris Strong, PG <br /> Senior Geologist <br /> WGR Southwest, Inc. <br /> 315 W. Pine Street, Suite 8 <br /> Lodi,CA 95240 <br /> cstrong cDwgr=sw.com <br /> off: (209)334-5363 ext. 206 <br />'i. cell: (209)487-4802 <br /> fax: (209)334-5374 <br /> z <br /> 8/31/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.