Laserfiche WebLink
TABLE OF CONTENTS AN <br />' 1.0 INTRODUCTION I <br /> 2.0 SITE BACKGROUND 1 <br />' 2.1 SITE DESCRIPTION 2 <br />' 2.2 SUMMARY OF PREVIOUS SITE CHARACTERIZATION WORK 2 <br /> 2 2 1 Tank Removal 2 <br />' 2 2 2 Initial Subsurface Investigation 3 <br /> 2.3 GEOLOGIC AND HYDROLOGIC CHARACTERISTICS 3 <br /> 3.0 PROPOSED SCOPE OF WORK . . 4 <br /> 3.1 INSTALLATION OF MONITORING WELLS 4 <br /> 3 1 1 Pilot Borings and Soil Sampling 5 <br /> 3 1 2 Well Installation and Development 6 <br /> 3 2AMPLIN F MONITORING WELLS 7 <br /> S G O ONTTO G <br />' 3.3 SUPPLY WELL SURVEY 8 <br /> 3.4 TECHNICAL REPORT 8 <br />' 3.5 HEALTH AND SAFETY 8 <br />' 4.0 SCHEDULE 9 <br />' 5.0 REFERENCES 9 <br /> • <br /> s3+aamv wpn PHILIP P. Ross, R.G. <br />