Laserfiche WebLink
Page 4 <br /> 6. Forced air injection. <br /> 7. Monitoring well installation. <br /> 5. SITE RESTORATION <br /> A. If the contamination was under 100 PPM replace the soil <br /> removed from the tank hole or haul it off. <br /> B. If the contamination was over 100 PPM follow the comp- <br /> rehensive plan, as accepted by the County or as modified <br /> by specific County Directives. <br /> C. Obtain the Counties approval and backfill the hole. <br /> Clean fill material will need to be added to take the <br /> place of the tank volume, and any material hauled off. <br /> Backfill material should be compacted to a minimum of <br /> 95%. <br /> D. Restore the surface to match the original pavement, and <br /> leave the site in a broom clean condition. <br /> By: W.F. Lewis Construction, Inc. <br />