Laserfiche WebLink
N. <br /> Step I High-pressure, hot-water wash; <br /> Step 2 Scrub with soapy water(non-phosphate or lab-grade detergent); <br /> Step 3 High-pressure hot-water rinse, and; <br /> Step 4 Air dry. <br /> Rinsate from decontamination procedures will be collected and later transferred to a temporary <br /> holding container on-site for proper recycling/disposal. <br /> 3.1.2 Well Installation and Development <br /> The monitoring wells be constructed of 2-inch diameter polyvinyl chloride(PVC) blank casing with <br /> machine slotted PVC well screen. The final construction of each monitoring well (including depth <br /> and length of screened interval, slot and filter pack size) will be based on subsurface conditions <br /> encountered in the respective pilot boring. <br /> The monitoring wells will be constructed within the hollow stem augers. The filter pack will be .� <br /> emplaced in successive lifts by pouring the sand through the augers from the bottom of each boring <br /> to a depth of about 1-foot above the top of the well screen (4 feet bgs). The augers will be <br /> withdrawn as the filter pack is emplaced. A I-foot thick bentonite pellet seal will be installed above <br /> the sand pack to a depth of 3 feet b s. <br /> g An additional 2 feet of annular space will be grouted with <br /> neat cement. A steel well cover and locking cap will be set in the cement around the to of th <br /> monitoring wells. The well cover will be installed about I foot below p e <br /> valve box with a traffic-rated steel cover. grade in a precast concrete <br /> After installation has been completed, the wells wiII be developed using a bailer <br /> or a hand-operated <br /> Pump. During development, the specific electric conductance pit temperature an <br /> development water will be measured and monitored. WeII development will d clarity of the <br /> is relatively colorless and free ofsediment and the field we elopm i parameters <br /> proceed until the water <br /> Water generated during development and water sampling activities will be eters have stabilized. <br /> holding containers on-site for proper recycling/disposal. placed in temporary <br /> After monitoring well installation and development, the Iocation and elevation for <br /> surveyed by a land surveyor licensed by the State of California. each well will be <br /> 3.2 SAMPLING OF MONITORING WELLS <br /> Groundwater samples will be collected initially from the newly installed monitoringwells <br /> construction and development and on a quarterly basis thereafter. prior to saznpI eachf well Presence of free floating PHC product will be assessed using a clear Teflon® or acrylic bailer.h, the <br /> The <br /> PHILIP P. ROSS, R.G. <br />