My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:53:54 PM
Creation date
5/12/2020 3:01:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 TECHNICAL REPORT <br /> Upon completion of the monitoring well installation, sampling, laboratory testing, and supply well <br /> Bey, a technical report will be prepared documenting the field activities and summarizing results <br /> and findings of the monitoring well sampling and well survey. This report will include figures <br /> depicting the monitoring well locations and existing site features -~ <br /> well locations. It will also include tabulated analytical results, h construction logs, and supply <br /> of permits obtained for the work. S , and copies <br /> In addition, quarterly data reports will be prepared, if required, follo <br /> sampling of the monitoring wells. These reports will summarize wing subsequentquarterly <br /> in tabular and P arize field activities and Presentata y <br /> graphic forms as appropriate. <br /> 3.5 HEALTH AND SAFETY .. <br /> This project's Health and Safe -' <br /> A copy offs plan ty Plan for the subsurface investigation is provided in <br /> by other cont le actor'ss personneavaill�nvolvsite during the field work. This 1 Appendix A. <br /> ed with this work. Pan is not intended for use <br /> 4.0 SCHEDULE <br /> It is estimated that the proposed scope of work can be <br /> the approval of this work plan, completed within 8 to 10 weeks following _ <br /> 5.0 REFERENCES <br /> Bartow, J. Alan and Tor H <br /> Range <br /> e and Nilsen, 1990, "Review of the <br /> 8 Northern San Joaquin Valle Great Valley Sequence, Eastern Diablo <br /> 226. Y, Central California,"USGS Open File Report 9o- <br /> BOYajian & Ross, Inc. <br /> Hydrocarbons, Site No. 5 (Site C"Work Work Plan for Initial Subsurface Investigation Code 1237}," report r <br /> 30, 1998. prepared for Port of Stockton, <br /> Petroleum <br /> n, June <br /> I998b, Initial Subsurface Investigation <br /> No. 5 (Site Code 1237),""report pre for Petroleum Hydrocarbons, Site <br /> Prepared for Part of Stockton, October 21, 1998, <br /> 8 PHILIP P. <br /> Ross,R.G. <br />
The URL can be used to link to this page
Your browser does not support the video tag.