My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
3500 - Local Oversight Program
>
PR0545660
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:53:54 PM
Creation date
5/12/2020 3:01:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0545660
PE
3528
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y: <br /> firms subcontracted to consultant, employees of contractors, employees of the Client, <br /> or employees of contractors retained by the Client. ' <br /> 4. Notify the PM and Client Contact of any medical conditions that may affect their <br /> I I ability to work. <br /> 6.4.1 Training Requirements for all Field Personnel <br /> Project personnel must be in compliance with OSHA regulations specified in 29 CFR 1910.120. <br /> These include: <br /> o Completion of a 40-hour health and safety training course. <br /> o Completion of an annual 8-hour health and safety update draining course. <br /> O Completion of an 8-hour supervisor's training course for those employees working in <br /> {I a supervising capacity. <br /> !1 7.0 SITE CONTROL <br /> i <br /> The"urpose of site control is to minimize the potential exposure to site hazards and to prevent <br /> vandalism at the site. <br /> r I� <br /> 7.1 SITE SECURITY <br /> Site isecurity will be the responsibility of the site owner. Contractors will be responsible for M <br /> I <br /> equipment stored at the sites. -� <br /> 7.2 COMMUNICATIONS — <br /> A field representative associated with each ongoing task should contact the project manager or office <br /> 1 <br /> at least once a day while in the field. <br /> t Location of closest telephone: <br /> M i o On-site mobile phone with field geologist. <br /> i <br /> 7 <br /> I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.