Laserfiche WebLink
1 <br /> 4.0 SCHEDULE <br /> B&R estimates that the proposed scope of work can be completed within 8 weeks following <br /> the approval of this work plan. <br /> 5.0 REFERENCES <br /> Bartow, J. Alan and Tor H. Nilsen, 1990, "Review of the Great Valley Sequence, Eastern <br /> Diablo Range and Northern San Joaquin Valley, Central California," USGS Open File <br /> Report 90-226. <br /> Central Valley Regional Water Quality Control Board, 1991, "Appendix A To Tri-Regional `J <br /> Recommendations -- Reporting," August 30, 1991. <br /> EMCON, 1998, "Fourth Quarter 1997 Groundwater Monitoring Report, Port of Stockton," <br /> report prepared for Stockton Terminals Technical Committee, March 27, 1998. j <br /> North Coast, San Francisco Bay, and Central Valley Regional Water Quality Control Boards, <br /> 1990, "Tri-Regional Board Staff Recommendations for Preliminary Investigation and <br /> Evaluation of Underground Tank Sites," August 10, 1990. <br /> Sierra-Pacific Groundwater Consultants, Inc., 1994, "Results of Soil Investigation at 2130 <br /> West Washington Street Facility, Stockton, California," report prepared for Unocal <br /> Corporation, Figure 11. Cross Section Between Borings P-38 and P46 May 11, 1994. ; 1 <br /> 1998, "First Semi-Annual 1998 Monitoring Report and Request for Regulatory <br /> Closure, Former PureGro Molasses Feed Product Facility, 2130 West Washington <br /> Street, Stockton," April 17, 1998. <br /> 6 981171S4USTINV,WP74 <br />