My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROYAL OAKS
>
0
>
3500 - Local Oversight Program
>
PR0545667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:46:38 PM
Creation date
5/12/2020 4:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545667
PE
3528
FACILITY_ID
FA0003947
FACILITY_NAME
COS ROYAL OAKS STORM PUMP
STREET_NUMBER
0
STREET_NAME
ROYAL OAKS
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
07228027
CURRENT_STATUS
02
SITE_LOCATION
ROYAL OAKS DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TC Associates SITE SAFETY PLAN <br /> Job Name: Royal Oaks Pump Station <br /> Job Location: Royal Park Lane & Princess Drive, Stockton, California <br /> Client Name: City of Stockton Public Works Department <br /> Project Number: 62574.0006 <br /> General Work Description: Site Investigation <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept on-site .and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior to entering the site. General safe work <br /> practices are`identified in the ATC's Injury .and ]Illness Prevention Manual and apply to all <br /> ATC work sites. <br /> The provisions set-forth in this SSP shall apply to ATC employees and any subcontractors <br /> working for ATC at the job site. All personnel working for ATC at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> increase the; safety requirements. ATC personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> ., <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures,appropriate amendments tothis SSP will be provided4 by the ATC project manager <br /> or supervisor,with the written approval-of a ATC project safety officer or the ATC Health and <br /> Safety Director. <br /> PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.